| # | Date | Type | Details | Furnace | Equipment | Actions |
|---|---|---|---|---|---|---|
| 15411 | 12 Aug 2020 | Scheduled Maintenance | 3RD FLOOR CARBON PASTE LIFTING CRANE LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. Greasing is done. 2. check the gearbox oil level, leakage, and fill if required. It is OK.we fill grease due to leakage. 3. check all fasteners and mounting bolts.it is ok. 4. check frame welding conditions.it is ok. 5. check end traveling gears condition and do the greasing. It is ok.greasing is done. 6. CT. It is ok. Gear bearing is ok.w HT. It's is ok. Pulley's condition is ok.greasing is done. | Other | CARBON PASTE LIFTING CRANE | |
| 15412 | 12 Aug 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 1 LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. not fixing properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. not fixing properly. | Other | TAPPING SEC. CRANE NO. 1 | |
| 15413 | 12 Aug 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 3 LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. not fixing properly. | Other | TAPPING SEC. CRANE NO. 3 | |
| 15414 | 12 Aug 2020 | Scheduled Maintenance | 3RD FLOOR CARBON PASTE LIFTING CRANE LT., CT. ,HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok. 2. check panel board, clean, & tight all loose parts. Clean and tighting all loose parts. 3. all parts clean by hand blower. 4. No limit switches. | Other | CARBON PASTE LIFTING CRANE | |
| 15415 | 11 Aug 2020 | Scheduled Maintenance | WATER CIRCULATION PUMP 1,2,3, pump no. 2 is ready. FURNACE 1 GRANULATION SUBMERSIBLE PUMP 1,2, PUMP 1,2 it's ok. POLLUTION WATER PUMP NO 1 It has heavy leakage. we fix it with gland rope. but still leakage. we need a new monoblock. FURNACE 2 GRANULATION PUMP 1,2, The greasing of coupling is done. POLLUTION WATER PUMP NO 1, its has leakage. we fix the leakage. now its ok. OFFICE SUBMERSIBLE PUMP 1, WASHING PLANT SUBMERSIBLE PUMP 1 washing plant side pump is ok. 1. check the pump condition and check discharge. 2. check coupling condition, alignment, and do greasing. 3. check pipelines and valve's condition. 4. check cooling towers nozzles condition. its condition is ok. | Other | PUMP | |
| 15416 | 11 Aug 2020 | Scheduled Maintenance | F1- GRANULATION MOTOR 1,2 WATER CIRCULATION PUMP MOTOR 1,2,3, SUBMERSIBLE PUMP MOTOR 1,2, POLLUTION WATER PUMP MOTOR NO 1 F2- GRANULATION MOTOR 1,2, POLLUTION WATER PUMP MOTOR NO 1, OFFICE SUBMERSIBLE PUMP MOTOR 1, WASHING PLANT SUBMERSIBLE PUMP MOTOR1 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.check and clean. All loose bolts and nuts tight. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. water circulation pump motor greasing. It is ok. | Other | PUMP | |
| 15417 | 10 Aug 2020 | Breakdown Maintenance | Front glass support plate with bolt 10 nos fitting is done. | Other | LODER NO. 9 | |
| 15418 | 10 Aug 2020 | Scheduled Maintenance | ALL CONVEYORS BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. it's ok. 2. check panel board, clean, & tight all loose parts. clean and tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. its ok. | Other | RMHS CONVEYOR | |
| 15419 | 10 Aug 2020 | Scheduled Maintenance | ALL VIBRATORS check Vibro feeders coil connection, its condition and ensure its working properly with adjusting its vibrations.CHECKING AND ADJUSTING VIBRATION IS DONE. IT IS not ok. It's vibrations are slow.we change it after batch adjustment. | Other | RMHS VIBRO FEEDER | |
| 15420 | 10 Aug 2020 | Scheduled Maintenance | ALL CONVEYORS BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7 1. greasing of bearings.greasing is done. 2. lubrication of rollers and check conditions.its ok. 3. check belt status ( if damaged than inform and change) and also check tightness, speed. we repaired BC 2, BC 6. 4. gearbox oil level check and if not then fill as per requirement.it's ok. 5. check coupling and key ( if damaged than inform and change) and do the greasing.it's ok. we CHANGE COUPLING OF BC 1. 6. check the drum condition. it's ok. 7. check mounting frame welding condition.it's ok. 8. check rollers condition and if not good then change. | Other | RMHS CONVEYOR | |