| 15381 | 14 Aug 2020 | Scheduled Maintenance | ELECTRODE BLOWER 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 2 | |
| 15382 | 14 Aug 2020 | Scheduled Maintenance | ELECTRODE BLOWER 3
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 3 | |
| 15383 | 14 Aug 2020 | Scheduled Maintenance | FURNACE 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves. all solenoids are checking and it's ok.
| Furnace II | HYDRAULIC POWER PACK NO. 1 | |
| 15384 | 14 Aug 2020 | Scheduled Maintenance | FURNACE 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves. all solenoids are checking and it's ok.
| Furnace II | HYDRAULIC POWER PACK NO. 2 | |
| 15385 | 14 Aug 2020 | Scheduled Maintenance | 1.check transformer temp. and oil level.it is ok.
2. check transformer oil leakage.no oil leakage.
3. check crystal color.it is ok. | Furnace II | FURNACE 2 TRANSFORMER NO. 1 ( GROUND FLOOR) | |
| 15386 | 14 Aug 2020 | Scheduled Maintenance | 1.check transformer temp. and oil level.it is ok.
2. check transformer oil leakage.no oil leakage.
3. check crystal color.it is ok. | Furnace II | FURNACE 2 TRANSFORMER NO. 2 | |
| 15387 | 14 Aug 2020 | Scheduled Maintenance | 1.check transformer temp. and oil level.it is ok.
2. check transformer oil leakage.no oil leakage.
3. check crystal color.it is not ok. when its come we will change it. | Furnace I | FURNACE 1 TRANSFORMER | |
| 15388 | 14 Aug 2020 | Scheduled Maintenance | 1.check solenoid valve condition and its pipe condition. we check all solenoid valves. its ok.
2.check pneumatic cylinders and air supply lines. its ok.
3. check charging chute leakage. if it is then inform HOD. | Furnace I | CHARGING CHUTES | |
| 15389 | 14 Aug 2020 | Scheduled Maintenance | 1.check solenoid valve condition and its pipe condition. we check all solenoid valves. it's ok.
2.check pneumatic cylinders and air supply lines. it's ok.
3. check charging chute leakage. if it is then inform HOD. | Furnace II | CHARGING CHUTES | |
| 15390 | 14 Aug 2020 | Scheduled Maintenance | 1. checking loose parts and check the hydraulic oil level in the tank. hydraulic tank level is ok. slipping side small amount of leakage.
2. check solenoid valve working conditions and adjust oil pressure. it's ok.
3. check hydraulic line leakage. one hoisting cylinder side pipe is leakage, we change it on the next shutdown. | Furnace I | HYDRAULIC POWER PACK NO. 1 | |