| 15361 | 18 Aug 2020 | Scheduled Maintenance | F1- GRANULATION MOTOR 1,2 WATER CIRCULATION PUMP MOTOR 1,2,3, SUBMERSIBLE PUMP MOTOR 1,2, POLLUTION WATER PUMP MOTOR
NO 1
F2- GRANULATION MOTOR 1,2, POLLUTION WATER PUMP MOTOR NO 1, OFFICE SUBMERSIBLE PUMP MOTOR 1,
WASHING PLANT SUBMERSIBLE PUMP MOTOR1
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.check and clean. All loose bolts and nuts tight.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. water circulation pump motor greasing. It is ok. | Other | PUMP | |
| 15362 | 18 Aug 2020 | Breakdown Maintenance | POLLUTION CHECKING AND REMOVING DUST INSIDE THE POLLUTION CYCLONE.
ONE GATE ALSO REMOVING FOR ID FAN NO. 2. | Other | POLLUTION 2 | |
| 15363 | 18 Aug 2020 | Breakdown Shutdown | SMOKE COMING POLLUTION SIDE SO MECH. GUYES NOT ABLE TO REMOVING DUST.SO FURNACE GOING SHUTDOWN. | Furnace II | POLLUTION 2 | |
| 15364 | 18 Aug 2020 | Other | old pressure ring eye bolt changing work is finished. we weld 4 nos. eye bolts. | Other | PRESSURE RING ( SPARE ) | |
| 15365 | 17 Aug 2020 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. it's ok.
2. check panel board, clean, & tight all loose parts. clean and tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly. its ok. | Other | RMHS CONVEYOR | |
| 15366 | 17 Aug 2020 | Scheduled Maintenance | ALL VIBRATORS
check Vibro feeders coil connection, its condition and ensure its working properly with adjusting its vibrations. BC 1 and BC 3 sides all Vibro feeders not in good condition. | Other | RMHS VIBRO FEEDER | |
| 15367 | 17 Aug 2020 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. greasing of bearings.greasing is done.
2. lubrication of rollers and check conditions.its ok.
3. check belt status ( if damaged than inform and change) and also check tightness, speed. we repaired BC 1 repaired, BC 6 is not in good condition we fitting fasteners.
4. gearbox oil level check and if not then fill as per requirement.it's ok.
5. check coupling and key ( if damaged than inform and change) and do the greasing.it's ok. BC 2 side coupling is not in good condition.
6. check the drum condition. it's ok.
7. check mounting frame welding condition.it's ok.
8. check rollers condition and if not good then change. we changer BC 1 5 NOS ROLLERS AND 2 NOS RETURN ROLLER.
BC 4 SIDE ONE ROLLER FITTING AT COUNTERWEIGHT SIDE. | Other | RMHS CONVEYOR | |
| 15368 | 17 Aug 2020 | Scheduled Maintenance | WHEN FURNACE IS IN SHUTDOWN. WE REPAIR ELECTRODE 3 SLIPPING CYLINDER BOLT WELDING.
SEAL BOX SIDE ROPE FIXING IS DONE DUE TO FIRE COMING TOPSIDE. AND ONE PRESSURE RING CP1 HOSE PIPE CHANGED.
| Furnace I | FURNACE 1 | |
| 15369 | 17 Aug 2020 | Breakdown Maintenance | contractor change C.T. AND 30 MTR CABLE CHANGED. | Other | TAPPING SEC. CRANE NO. 1 | |
| 15370 | 17 Aug 2020 | Scheduled Maintenance | its connection given and start. | Other | Briquettes machine | |