| 15331 | 20 Aug 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 1 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. checked its ok. we open and fill grease. 2. check the gearbox oil level, leakage, and fill if required. gearbox has leakage. we fill grease. 3. check all fasteners and mounting bolts. it's ok. 4. check frame welding conditions. it's ok. 5. check end traveling gears condition and do the greasing. greasing is done. CT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. coupling is ok. 2. check the gearbox oil level, leakage, and fill if required. we fill grease. 3. check all fasteners and mounting bolts. it's ok. 4. check frame welding conditions. its ok. 5. check end traveling gears condition and do the greasing. HT. 1. check rope drum, hook, rope condition. greasing of rope. already grease is on the rope. 2. check the thruster drum condition and its brake tightness. no truster. it's ok. 3. check all fasteners and mounting bolts. it's ok. 4. check frame welding conditions. its ok. | Other | TAPPING SEC. CRANE NO. 1 | |
| 15332 | 20 Aug 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 3 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. its ok. 2. check the gearbox oil level, leakage, and fill if required. gearbox has small leakage. we fill grease. 3. check all fasteners and mounting bolts. motor and gearbox do not have foundation bolts. we mount foundation bolts. its coupling side bolt is going loose. we tight it also. 4. check frame welding conditions. it's ok. 5. check end traveling gears condition and do the greasing. no end traveling gears. CT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. it's ok. coupling greasing is done. 2. check the gearbox oil level, leakage, and fill if required. gearbox side leakage. we fill grease. 3. check all fasteners and mounting bolts. all foundation bolts are in good condition. 4. check frame welding conditions. it's ok. 5. check end traveling gears condition and do the greasing. greasing is done. HT. 1. check rope drum, hook, rope condition. greasing of rope. already grease is there. 2. check the thruster drum condition and its brake tightness. the thruster is in good condition. 3. check all fasteners and mounting bolts. it's in good condition. 4. check frame welding conditions. it's ok. | Other | TAPPING SEC. CRANE NO. 3 | |
| 15333 | 20 Aug 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 1 LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.no limit switch. mechanical dept. making one and fixing. | Other | TAPPING SEC. CRANE NO. 1 | |
| 15334 | 20 Aug 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 3 LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. | Other | TAPPING SEC. CRANE NO. 3 | |
| 15335 | 20 Aug 2020 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 1 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing.checked and greasing is done. 2. check the gearbox oil level, leakage, and fill if required. we found leakage so we fill some amount of grease. 3. check all fasteners and mounting bolts. it is ok. 4. check frame welding conditions. it is not ok. its shaft condition is not good.motor frame welding is done. 5. check end traveling gears condition and do the greasing. it is ok. CT. gears are ok. it is good in condition. HT. 1. check rope drum, hook, rope condition. greasing of rope.rope greasing is done. it is in good condition. 2. check the thruster drum condition and its brake tightness.no thruster. 3. check all fasteners and mounting bolts. it is ok. 4. check frame welding conditions.it is ok. | Other | CHIPPING YARD CRANE NO. 1 | |
| 15336 | 20 Aug 2020 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 2 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. greasing is done. it is ok. 2. check the gearbox oil level, leakage, and fill if required. no leakage but we fill grease. 3. check all fasteners and mounting bolts. it is ok. 4. check frame welding conditions. it is ok. 5. check end traveling gears condition and do the greasing. CT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. greasing is done. it is ok. 2. check the gearbox oil level, leakage, and fill if required. no leakage but we fill grease. 3. check all fasteners and mounting bolts. it is ok. 4. check frame welding conditions. it is ok. 5. check end traveling gears condition and do the greasing.it is ok. greasing is done. HT. 1. check rope drum, hook, rope condition. greasing of rope. greasing is done. we found that it is damage. we open and repaired. 2. check the thruster drum condition and its brake tightness. no thruster. 3. check all fasteners and mounting bolts. It is ok. 4. check frame welding conditions.it is ok. | Other | CHIPPING YARD CRANE NO. 2 | |
| 15337 | 20 Aug 2020 | Scheduled Maintenance | TELPHER FOR F1 1. checking the bearing, rollers condition, and do lubrication.check it is ok. 2. checking frames welding condition.it is ok. 3. checking cotter pin and its failure condition. it is ok. | Other | TELPHER (FURNACE 1) | |
| 15338 | 20 Aug 2020 | Scheduled Maintenance | TELPHER FOR F2 1. checking the bearing, rollers condition, and do lubrication.check it is ok. 2. checking frames welding condition.it is ok. 3. checking cotter pin and its failure condition. it is ok. | Other | TELPHER ( FURNACE 2) | |
| 15339 | 20 Aug 2020 | Scheduled Maintenance | POLLUTION ID FANS (Furnace 1) 1. open cover and clean dust.clean and balancing is done. tight nut bolts. 2. check the balancing of impeller and vibration isolation.it is ok. 3. check v belts condition and inform if it's on critical stage.it is ok. 4. check foundation bolts and nuts of Plummer blocks.it is ok. 5. greasing the Plummer blocks.greasing is done. 6. check the duct condition and remove dust from the duct. 7. check stack condition and check its temperature. it is ok. | Other | POLLUTION 1 | |
| 15340 | 20 Aug 2020 | Scheduled Maintenance | POLLUTION ID FANS FOR (Furnace 2) id fan no. 2 start. 1. open cover and clean dust.clean and balancing is done. tight nut bolts. 2. check the balancing of impeller and vibration isolation.it is ok. 3. check v belts condition and inform if it's on critical stage.it is ok. 4. check foundation bolts and nuts of Plummer blocks.tight and mount one another check nut.. 5. greasing the Plummer blocks.greasing is done. 6. check the duct condition and remove dust from the duct. 7. check stack condition and check its temperature. it is ok. | Other | POLLUTION 2 | |