| 15251 | 28 Aug 2020 | Scheduled Maintenance | FURNACE 1
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves. all are checked and clean.
| Furnace I | HYDRAULIC POWER PACK NO. 1 | |
| 15252 | 28 Aug 2020 | Scheduled Maintenance | FURNACE 1
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower. | Furnace I | HYDRAULIC POWER PACK NO. 2 | |
| 15253 | 28 Aug 2020 | Scheduled Maintenance | ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 1 | |
| 15254 | 28 Aug 2020 | Scheduled Maintenance | ELECTRODE BLOWER 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 2 | |
| 15255 | 28 Aug 2020 | Scheduled Maintenance | ELECTRODE BLOWER 3
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 3 | |
| 15256 | 28 Aug 2020 | Scheduled Maintenance | FURNACE 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.clean and checked. now its ok. | Furnace II | HYDRAULIC POWER PACK NO. 1 | |
| 15257 | 28 Aug 2020 | Scheduled Maintenance | FURNACE 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.clean and checked. now its ok. | Furnace II | HYDRAULIC POWER PACK NO. 2 | |
| 15258 | 28 Aug 2020 | Scheduled Maintenance | 1.check transformer temp. and oil level.it is ok.
2. check transformer oil leakage.no oil leakage.
3. check crystal color. its ok. | Furnace II | FURNACE 2 TRANSFORMER NO. 1 ( GROUND FLOOR) | |
| 15259 | 28 Aug 2020 | Scheduled Maintenance | 1.check transformer temp. and oil level.it is ok.
2. check transformer oil leakage.no oil leakage.
3. check crystal color. its ok. | Furnace II | FURNACE 2 TRANSFORMER NO. 2 | |
| 15260 | 28 Aug 2020 | Scheduled Maintenance | 1.check transformer temp. and oil level.it is ok.
2. check transformer oil leakage.no oil leakage.
3. check crystal color. its silica gel is not ok. we change it when its coming. | Furnace I | FURNACE 1 TRANSFORMER | |