Maintenance Report

Search Filter:

Showing 15,241-15,250 of 17,159 items.

#DateTypeDetailsFurnaceEquipmentActions
1524131 Aug 2020Scheduled MaintenanceALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. greasing of bearings.grease is already there.
2. lubrication of rollers and check conditions.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.BC 6, BC 5, AND BC 2 repairing is done.
4. gearbox oil level check and if not then fill as per requirement.
5. check coupling and key ( if damaged than inform and change) and do the greasing.BC 2 COUPLING CHANGING NEXT TIME.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change. BC2 AND BC1 SIDE ROLLERS FITTING IS DONE.
OtherRMHS CONVEYOR
1524231 Aug 2020Scheduled MaintenanceWHEN WE CHACKING PUMP. WE FOUND THAT IT IS AIR LOCKED. WE REPAIRED IT NOW it's WORKING.OtherGRANULATION TANK (FURNACE 2)
1524331 Aug 2020Scheduled Maintenancenew vibro feeder with tray 2 nos assembly is done.OtherRMHS VIBRO FEEDER
1524429 Aug 2020Scheduled MaintenanceWASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP

WASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP


1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. Check it is ok.
2. check panel board, clean, & tight all loose parts. Clean and tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly. It's ok.
5. check the high mast lights also.its ok
OtherWASHING PLANT
1524529 Aug 2020Breakdown MaintenanceCRANE NO. 1 INTERNAL MOTOR BOLTS ARE LOOSE. WE OPEN IT AND TIGHT THE BOLTS. NOW ITS OK.OtherTAPPING SEC. CRANE NO. 1
1524629 Aug 2020Breakdown Maintenancefurnace 1 old crane c.t and hoist new cable changed and ceiling rope also changed.Furnace ITAPPING SEC. CRANE NO. 1
1524729 Aug 2020Breakdown Maintenancecrane no.2 hoist motor connection given and threster oil filledOtherTAPPING SEC. CRANE NO. 2
1524828 Aug 2020Scheduled MaintenanceF1- ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
Furnace IELECTRODE 1
1524928 Aug 2020Scheduled MaintenanceF1- ELECTRODE BLOWER 2

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
Furnace IELECTRODE 2
1525028 Aug 2020Scheduled MaintenanceF1- ELECTRODE BLOWER 3

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.

Furnace IELECTRODE 3