Maintenance Report
Search Filter:
Showing 15,181-15,190 of 17,159 items.
| # | Date | Type | Details | Furnace | Equipment | Actions |
|---|---|---|---|---|---|---|
| 15181 | 08 Sep 2020 | Other | Single phase welding machine not working it was check and repaired now its working. | Other | WELDING MACHINE | |
| 15182 | 07 Sep 2020 | Scheduled Maintenance | ALL CONVEYORS BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. | Other | RMHS CONVEYOR | |
| 15183 | 07 Sep 2020 | Scheduled Maintenance | ALL VIBRATORS check the Vibro feeders coil connection, its condition and ensure its working properly with adjusting its vibrations. some Vibro feeders are not good. we were changed 3 nos. Vibro feeder at BC 3 side. | Other | RMHS VIBRO FEEDER | |
| 15184 | 07 Sep 2020 | Scheduled Maintenance | ALL CONVEYORS BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7 1. greasing of bearings.grease is already there. 2. lubrication of rollers and check conditions. 3. check belt status ( if damaged than inform and change) and also check tightness, speed.BC 6, BC 7, AND BC 5 repairs are done. 4. gearbox oil level check and if not then fill as per requirement. 5. check coupling and key ( if damaged than inform and change) and do the greasing.BC 2, BC 6 COUPLING CHANGING NEXT TIME. 6. check the drum condition. 7. check mounting frame welding condition. 8. check rollers condition and if not good then change. BC6 SIDE ROLLERS FITTING IS DONE. 6. check the drum condition. 7. check mounting frame welding condition. 8. check rollers condition and if not good then change. | Other | RMHS CONVEYOR | |
| 15185 | 07 Sep 2020 | Breakdown Maintenance | Discharge vibrofeeder no.2 old one replaced now its working and calibration also done. | Other | RMHS VIBRO FEEDER | |
| 15186 | 05 Sep 2020 | Scheduled Maintenance | TILTING HOPPER 1. greasing all bushes. 2.hydraulic pump and motor coupling. It's ok. 3. checking the hydraulic oil level and if not then fill. it's ok. The oil level is good. 4. check hopper welding sections. we found one crack at the hydraulic side. we weld it. now its ok. CONVEYOR NO 1 1. greasing of bearings. 2. lubrication of rollers and check conditions. The check is done. 3. check belt status ( if damaged than inform and change) and also check tightness, speed.its not ok. We mount some conveyor pieces and fasteners. 4. gearbox oil level check and if not then fill as per requirement.it's ok. 5. check coupling and key ( if damaged than inform and change) and do the greasing. it's ok. 6. check the drum condition. It's ok. 7. check mounting frame welding condition. it's ok. 8. check rollers condition and if not good then change. CRUSHER 1. check the crusher foundation.it's ok. 2. check V belts condition.it's ok. good in condition. 3. do greasing. greasing in the bearing is done. 4. check spring rod condition and the gap between plates.it's ok. 5. crusher side we making one cover. VIBRATOR 1. check the spring condition. 3 nos spring changed. 2. check V belts condition. it's ok. 3. check vibrations if not good then adjust. it's ok. 4. check the frame welding condition. it's ok. 5. Greasing of bearing is done. 6. vibrator frame and motor frame welding is done. ROLLER 1. check roller speed.it's ok. 2.greasing of bearings. 3.gearbox oil level check and if not then fill as per requirement.it's ok. 4. check coupling and key ( if damaged than inform and change) and do the greasing. it's ok. 5. check the drum condition. it's ok. 6. check the mounting frame welding condition. it's ok. 7. mesh is in good condition. DISCHARGE CONVEYOR 1. greasing of bearings.greasing is done. 2. lubrication of rollers and check conditions.its ok. 3. check belt status ( if damaged than inform and change) and also check tightness, speed. its ok.we repairs the conveyor. 4. gearbox oil level check and if not then fill as per requirement. its ok.filling grease is done. 5. check coupling and key ( if damaged than inform and change) and do the greasing. it's ok. 6. check the drum condition. 7. check mounting frame welding condition. it's ok. 8. check rollers condition and if not good then change. | Other | WASHING PLANT | |
| 15187 | 05 Sep 2020 | Scheduled Maintenance | WASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. Check it is ok. 2. check panel board, clean, & tight all loose parts. Clean and tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. It's ok. 5. check the high mast lights also.its ok | Other | WASHING PLANT | |
| 15188 | 05 Sep 2020 | Breakdown Maintenance | crane no.2 L.T,C.T and hoist Limit switch fixing is done | Other | TAPPING SEC. CRANE NO. 2 | |
| 15189 | 05 Sep 2020 | Other | 22 kw submersible U pump checked with 200 volts transformer near furnace 1 granulation tank. | Other | SUBMERSIBLE PUMP | |
| 15190 | 04 Sep 2020 | Scheduled Maintenance | F1- ELECTRODE BLOWER 1 SEAL COOLING BLOWER 1, 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok. 2. check panel board, clean, & tight all loose parts.clean and tight all loose parts. 3. all parts clean by hand blower. | Furnace I | ELECTRODE 1 | |