Maintenance Report

Search Filter:

Showing 15,111-15,120 of 17,159 items.

#DateTypeDetailsFurnaceEquipmentActions
1511115 Sep 2020Scheduled MaintenanceSINGLE [HASE NEW COMPRESSOR CONNECTION GIVING AND PRESSURE CHECKING. It's RUNNING NORMALLY.OtherCOMPRESSOR
1511214 Sep 2020Scheduled MaintenanceALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
OtherRMHS CONVEYOR
1511314 Sep 2020Scheduled MaintenanceALL VIBRATORS
check the Vibro feeders coil connection, its condition and ensure its working properly with adjusting its vibrations. no 3 Vibro feeders not working we check and calibration is done.
OtherRMHS VIBRO FEEDER
1511414 Sep 2020Scheduled MaintenanceALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. greasing of bearings.grease is already there.
2. lubrication of rollers and check conditions.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.BC 6, BC 7, AND BC 5, BC 4 repairs are done.
4. gearbox oil level check and if not then fill as per requirement.
5. check coupling and key ( if damaged than inform and change) and do the greasing.BC 2, BC 6 COUPLING CHANGING NEXT TIME.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change. BC6 SIDE ROLLERS FITTING IS DONE.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change.
OtherRMHS CONVEYOR
1511514 Sep 2020Breakdown MaintenanceIt's dust cleaning and start.OtherPOLLUTION 2, ID FAN NO. 1
1511613 Sep 2020Scheduled Maintenanceload cells all terminal checking and its cleaning is done.
the connector also checking and its platform out, and all send out.
OtherWEIGH BRIDGE
1511713 Sep 2020Scheduled MaintenanceThe hydraulic motor connection given is done.OtherJCB ARM
1511812 Sep 2020Scheduled Maintenancefor the crusher, one conveyor fabrication is done.
we making one conveyor with gearing power transfer.
Othercrusher
1511912 Sep 2020Scheduled MaintenanceTILTING HOPPER
1. greasing all bushes.
2.hydraulic pump and motor coupling. It's ok.
3. checking the hydraulic oil level and if not then fill. it's ok. The oil level is good.
4. check hopper welding sections. we found one crack at the hydraulic side. we weld it. now its ok.

CONVEYOR NO 1
1. greasing of bearings.
2. lubrication of rollers and check conditions. The check is done.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.its not ok. We mount some conveyor pieces and fasteners.
4. gearbox oil level check and if not then fill as per requirement.it's ok.
5. check coupling and key ( if damaged than inform and change) and do the greasing. it's ok.
6. check the drum condition. It's ok.
7. check mounting frame welding condition. it's ok.
8. check rollers condition and if not good then change.


CRUSHER
1. check the crusher foundation.it's ok.
2. check V belts condition.it's ok. good in condition.
3. do greasing. greasing in the bearing is done.
4. check spring rod condition and the gap between plates.it's ok.
5. crusher side we making one cover.

VIBRATOR
1. check the spring condition. it is ok.
2. check V belts condition. it's ok.
3. check vibrations if not good then adjust. it's ok.
4. check the frame welding condition. it's ok.
5. Greasing of bearing is done.
6. vibrator frame and motor frame welding are done.
7. one side bearing is damaged. we change it. bearing no. is 6313.

ROLLER
1. check roller speed.it's ok.
2.greasing of bearings.
3.gearbox oil level check and if not then fill as per requirement.it's ok.
4. check coupling and key ( if damaged than inform and change) and do the greasing. it's ok.
5. check the drum condition. it's ok.
6. check the mounting frame welding condition. it's ok.
7. mesh is in good condition.

DISCHARGE CONVEYOR
1. greasing of bearings.greasing is done.
2. lubrication of rollers and check conditions.its ok.
3. check belt status ( if damaged than inform and change) and also check tightness, speed. its ok.we repairs the conveyor.
4. gearbox oil level check and if not then fill as per requirement. its ok.filling grease is done.
5. check coupling and key ( if damaged than inform and change) and do the greasing. it's ok.
6. check the drum condition.
7. check mounting frame welding condition. it's ok.
8. check rollers condition and if not good then change.
OtherWASHING PLANT
1512012 Sep 2020Scheduled MaintenanceWASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. Check it is ok.
2. check panel board, clean, & tight all loose parts. Clean and tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly. It's ok.
5. check the high mast lights also.its ok
OtherWASHING PLANT