| 15101 | 16 Sep 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 3
LT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok.
2. check panel board, clean, & tight all loose parts. clean and tight loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly.
CT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok.
2. check panel board, clean, & tight all loose parts. clean and tight loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly.
HT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok.
2. check panel board, clean, & tight all loose parts. clean and tight loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. | Other | TAPPING SEC. CRANE NO. 3 | |
| 15102 | 16 Sep 2020 | Scheduled Maintenance | 3RD FLOOR CARBON PASTE LIFTING CRANE
LT, C.T, AND H.T.
1. checked the motor condition ( amp, volt, and connectivity). no noise coming. it is ok.
2. checked panel board, clean, & tight all loose parts.
3. all parts clean by hand blower. | Other | CARBON PASTE LIFTING CRANE | |
| 15103 | 16 Sep 2020 | Scheduled Maintenance | 250 KVA D.G. CLEANING IS DONE. | Other | D.G. | |
| 15104 | 16 Sep 2020 | Scheduled Maintenance | 250 HPV lamp set 4 nos changed. | Other | LAMP | |
| 15105 | 16 Sep 2020 | Breakdown Maintenance | kitchen guest house side water cooler switchboard short circuit it was repaired and 4 tube light changed. | Other | GUEST HOUSE | |
| 15106 | 16 Sep 2020 | Breakdown Maintenance | tapping crane np. 3 busbar line B phase insulator broken. it was removed and replaced the new one. | Other | TAPPING SEC. CRANE NO. 3 | |
| 15107 | 16 Sep 2020 | Scheduled Maintenance | current collector coming out we repaired it. | Other | CHIPPING YARD CRANE NO. 2 | |
| 15108 | 15 Sep 2020 | Scheduled Maintenance | WATER CIRCULATION PUMP 1,2,3,
pump no. 2 is ready.
FURNACE 1
GRANULATION
SUBMERSIBLE PUMP 1,2, PUMP 1,2
it's ok.
POLLUTION WATER PUMP NO 1
It has heavy leakage. we fix it with gland rope. but still leakage. we need a new monoblock.
FURNACE 2
GRANULATION PUMP 1,2,
The greasing of coupling is done.
POLLUTION WATER PUMP NO 1,
it has leakage. we fix the leakage. now it's ok.
OFFICE SUBMERSIBLE PUMP 1,
WASHING PLANT SUBMERSIBLE PUMP 1
washing plant side pump is ok.
1. check the pump condition and check discharge.
2. check coupling condition, alignment, and do greasing.
3. check pipelines and valve's condition.
4. check cooling towers nozzles condition. its condition is ok. | Other | PUMP | |
| 15109 | 15 Sep 2020 | Scheduled Maintenance | F1- GRANULATION MOTOR 1,2 WATER CIRCULATION PUMP MOTOR 1,2,3, SUBMERSIBLE PUMP MOTOR 1,2, POLLUTION WATER PUMP MOTOR
NO 1
F2- GRANULATION MOTOR 1,2, POLLUTION WATER PUMP MOTOR NO 1, OFFICE SUBMERSIBLE PUMP MOTOR 1,
WASHING PLANT SUBMERSIBLE PUMP MOTOR1
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.check and clean. All loose bolts and nuts tight.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. water circulation pump motor greasing. It is ok.
| Other | PUMP | |
| 15110 | 15 Sep 2020 | Scheduled Maintenance | F2 AUTO TRANSFORMER SIDE ONE LITGH FITTING IS DONE. | Other | FURNACE 2 TRANSFORMER NO. 1 ( GROUND FLOOR) | |