| 15081 | 18 Sep 2020 | Breakdown Maintenance | single phase 3 hp submersible motor pump coil short it was taking out and replaced three phase 5 hp submersible motor and one DOL starter also fixed, now its working normally. | Other | SUBMERSIBLE PUMP | |
| 15082 | 18 Sep 2020 | Breakdown Maintenance | chipping yard new crane busbar current collector coming out it was refitted now its ok. | Other | CHIPPING YARD CRANE NO. 2 | |
| 15083 | 17 Sep 2020 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 1 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing.checked and greasing is done. 2. check the gearbox oil level, leakage, and fill if required. we found leakage so we fill some amount of grease. 3. check all fasteners and mounting bolts. it is ok. 4. check frame welding conditions. it is not ok. its shaft condition is not good. we need to change it. 5. check end traveling gears condition and do the greasing. it is ok. CT. gears are ok. it is good in condition. HT. 1. check rope drum, hook, rope condition. greasing of rope. rope greasing is done. it is in good condition. 2. check the thruster drum condition and its brake tightness.no thruster. 3. check all fasteners and mounting bolts. it is ok. 4. check frame welding conditions.it is ok. | Other | CHIPPING YARD CRANE NO. 1 | |
| 15084 | 17 Sep 2020 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 2 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. greasing is done. it is ok. 2. check the gearbox oil level, leakage, and fill if required. no leakage but we fill grease. 3. check all fasteners and mounting bolts. it is ok. 4. check frame welding conditions. it is ok. 5. check end traveling gears condition and do the greasing. CT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. greasing is done. it is ok. 2. check the gearbox oil level, leakage, and fill if required. no leakage but we fill grease. 3. check all fasteners and mounting bolts. it is ok. 4. check frame welding conditions. it is ok. 5. check end traveling gears condition and do the greasing.it is ok. greasing is done. HT. 1. check rope drum, hook, rope condition. greasing of rope. greasing is done. we found that it is damage. we open and repaired. 2. check the thruster drum condition and its brake tightness. no thruster. 3. check all fasteners and mounting bolts. It is ok. 4. check frame welding conditions.it is ok. | Other | CHIPPING YARD CRANE NO. 2 | |
| 15085 | 17 Sep 2020 | Scheduled Maintenance | TELPHER FOR F1 1. checking the bearing, rollers condition, and do lubrication. checked it is ok. 2. checking frames welding condition.it is ok. 3. checking cotter pin and its failure condition. it is ok. | Other | TELPHER (FURNACE 1) | |
| 15086 | 17 Sep 2020 | Scheduled Maintenance | TELPHER FOR F2 1. checking the bearing, rollers condition, and do lubrication.check it is ok. 2. checking frames welding condition.it is ok. 3. checking cotter pin and its failure condition. it is ok. | Other | TELPHER ( FURNACE 2) | |
| 15087 | 17 Sep 2020 | Scheduled Maintenance | POLLUTION ID FANS (Furnace 1) 1. open cover and clean dust.clean and balancing is done. tight nut bolts. 2. check the balancing of impeller and vibration isolation.it is ok. 3. check v belts condition and inform if it's on critical stage.it is ok. 4. check foundation bolts and nuts of Plummer blocks.it is ok. 5. greasing the Plummer blocks.greasing is done. 6. check the duct condition and remove dust from the duct. 7. check stack condition and check its temperature. it is ok. | Other | POLLUTION 1 | |
| 15088 | 17 Sep 2020 | Scheduled Maintenance | POLLUTION ID FANS FOR (Furnace 2) its 2nd blower Plummer block foundation is broken due to excessive vibration. 1. open cover and clean dust.clean and balancing is done. tight nut bolts. 2. check the balancing of impeller and vibration isolation.it is ok. 3. check v belts condition and inform if it's on critical stage.it is ok. 4. check foundation bolts and nuts of Plummer blocks.it is ok. 5. greasing the Plummer blocks.greasing is done. 6. check the duct condition and remove dust from the duct. 7. check stack condition and check its temperature. it is ok. | Other | POLLUTION 2 | |
| 15089 | 17 Sep 2020 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 1 bus bar line is ok. LT. 1. check the motor condition. 2. checked panel board, clean, & tight all loose parts. 4. check limit switches and its condition.it is ok. CT. 1. check the motor condition. it is ok. 2.check limit switches and their condition.it is ok. HT. 1. check the motor condition. it is ok. | Other | CHIPPING YARD CRANE NO. 1 | |
| 15090 | 17 Sep 2020 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 2 bus bar line is ok. LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok. 2. check panel board, clean, & tight all loose parts. clean and tight loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly. | Other | CHIPPING YARD CRANE NO. 2 | |