Maintenance Report

Search Filter:

Showing 15,081-15,090 of 17,159 items.

#DateTypeDetailsFurnaceEquipmentActions
1508118 Sep 2020Breakdown Maintenancesingle phase 3 hp submersible motor pump coil short it was taking out and replaced three phase 5 hp submersible motor and one DOL starter also fixed, now its working normally.OtherSUBMERSIBLE PUMP
1508218 Sep 2020Breakdown Maintenancechipping yard new crane busbar current collector coming out it was refitted now its ok.OtherCHIPPING YARD CRANE NO. 2
1508317 Sep 2020Scheduled MaintenanceCHIPPING YARD E.O.T. CRANE 1
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.checked and greasing is done.
2. check the gearbox oil level, leakage, and fill if required. we found leakage so we fill some amount of grease.
3. check all fasteners and mounting bolts. it is ok.
4. check frame welding conditions. it is not ok. its shaft condition is not good. we need to change it.
5. check end traveling gears condition and do the greasing. it is ok.

CT.
gears are ok. it is good in condition.
HT.
1. check rope drum, hook, rope condition. greasing of rope. rope greasing is done. it is in good condition.
2. check the thruster drum condition and its brake tightness.no thruster.
3. check all fasteners and mounting bolts. it is ok.
4. check frame welding conditions.it is ok.
OtherCHIPPING YARD CRANE NO. 1
1508417 Sep 2020Scheduled MaintenanceCHIPPING YARD E.O.T. CRANE 2


LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing. greasing is done. it is ok.
2. check the gearbox oil level, leakage, and fill if required. no leakage but we fill grease.
3. check all fasteners and mounting bolts. it is ok.
4. check frame welding conditions. it is ok.
5. check end traveling gears condition and do the greasing.

CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing. greasing is done. it is ok.
2. check the gearbox oil level, leakage, and fill if required. no leakage but we fill grease.
3. check all fasteners and mounting bolts. it is ok.
4. check frame welding conditions. it is ok.
5. check end traveling gears condition and do the greasing.it is ok. greasing is done.

HT.
1. check rope drum, hook, rope condition. greasing of rope. greasing is done. we found that it is damage. we open and repaired.
2. check the thruster drum condition and its brake tightness. no thruster.
3. check all fasteners and mounting bolts. It is ok.
4. check frame welding conditions.it is ok.
OtherCHIPPING YARD CRANE NO. 2
1508517 Sep 2020Scheduled MaintenanceTELPHER FOR F1
1. checking the bearing, rollers condition, and do lubrication. checked it is ok.
2. checking frames welding condition.it is ok.
3. checking cotter pin and its failure condition. it is ok.

OtherTELPHER (FURNACE 1)
1508617 Sep 2020Scheduled MaintenanceTELPHER FOR F2

1. checking the bearing, rollers condition, and do lubrication.check it is ok.
2. checking frames welding condition.it is ok.
3. checking cotter pin and its failure condition. it is ok.
OtherTELPHER ( FURNACE 2)
1508717 Sep 2020Scheduled MaintenancePOLLUTION ID FANS (Furnace 1)
1. open cover and clean dust.clean and balancing is done. tight nut bolts.
2. check the balancing of impeller and vibration isolation.it is ok.
3. check v belts condition and inform if it's on critical stage.it is ok.
4. check foundation bolts and nuts of Plummer blocks.it is ok.
5. greasing the Plummer blocks.greasing is done.
6. check the duct condition and remove dust from the duct.
7. check stack condition and check its temperature. it is ok.
OtherPOLLUTION 1
1508817 Sep 2020Scheduled MaintenancePOLLUTION ID FANS FOR (Furnace 2)
its 2nd blower Plummer block foundation is broken due to excessive vibration.
1. open cover and clean dust.clean and balancing is done. tight nut bolts.
2. check the balancing of impeller and vibration isolation.it is ok.
3. check v belts condition and inform if it's on critical stage.it is ok.
4. check foundation bolts and nuts of Plummer blocks.it is ok.
5. greasing the Plummer blocks.greasing is done.
6. check the duct condition and remove dust from the duct.
7. check stack condition and check its temperature. it is ok.
OtherPOLLUTION 2
1508917 Sep 2020Scheduled MaintenanceCHIPPING YARD E.O.T. CRANE 1

bus bar line is ok.
LT.
1. check the motor condition.
2. checked panel board, clean, & tight all loose parts.
4. check limit switches and its condition.it is ok.

CT.
1. check the motor condition. it is ok.
2.check limit switches and their condition.it is ok.

HT.
1. check the motor condition. it is ok.
OtherCHIPPING YARD CRANE NO. 1
1509017 Sep 2020Scheduled MaintenanceCHIPPING YARD E.O.T. CRANE 2


bus bar line is ok.
LT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok.
2. check panel board, clean, & tight all loose parts. clean and tight loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly.

CT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok.
2. check panel board, clean, & tight all loose parts. clean and tight loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly.

HT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. checked. it is ok.
2. check panel board, clean, & tight all loose parts. clean and tight loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.it is ok. working properly.
OtherCHIPPING YARD CRANE NO. 2