| 15061 | 18 Sep 2020 | Scheduled Maintenance | FURNACE 1
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.its ok. | Furnace I | HYDRAULIC POWER PACK NO. 2 | |
| 15062 | 18 Sep 2020 | Scheduled Maintenance | ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
| Furnace II | ELECTRODE 1 | |
| 15063 | 18 Sep 2020 | Scheduled Maintenance | ELECTRODE BLOWER 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
| Furnace II | ELECTRODE 2 | |
| 15064 | 18 Sep 2020 | Scheduled Maintenance | ELECTRODE BLOWER 3
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
| Furnace II | ELECTRODE 3 | |
| 15065 | 18 Sep 2020 | Scheduled Maintenance | FURNACE 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.its ok. | Furnace II | HYDRAULIC POWER PACK NO. 1 | |
| 15066 | 18 Sep 2020 | Scheduled Maintenance | FURNACE 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.its ok. | Furnace II | HYDRAULIC POWER PACK NO. 2 | |
| 15067 | 18 Sep 2020 | Scheduled Maintenance | 1.check transformer temp. and oil level.it is ok.
2. check transformer oil leakage.no oil leakage.
3. check crystal color. its ok. | Furnace II | FURNACE 2 TRANSFORMER NO. 1 ( GROUND FLOOR) | |
| 15068 | 18 Sep 2020 | Scheduled Maintenance | 1.check transformer temp. and oil level.it is ok.
2. check transformer oil leakage.no oil leakage.
3. check crystal color. its ok. | Furnace II | FURNACE 2 TRANSFORMER NO. 2 | |
| 15069 | 18 Sep 2020 | Scheduled Maintenance | 1.check transformer temp. and oil level.it is ok.
2. check transformer oil leakage.no oil leakage.
3. check crystal color. its silica gel is not ok. we change it when its coming. | Furnace I | FURNACE 1 TRANSFORMER | |
| 15070 | 18 Sep 2020 | Scheduled Maintenance | 1.check solenoid valve condition and its pipe condition. it is ok. solenoid valves are in good condition.
2.check pneumatic cylinders and air supply lines.it is ok.
3. check charging chute leakage. if it is then inform HOD. small leakage we weld it on next shut down. | Furnace I | CHARGING CHUTES | |