| 15041 | 22 Sep 2020 | Breakdown Shutdown | TRANSFORMER TOP SIDE EARTH INSULATOR BUSH OIL LEAKEGED ARRESTED AND CLEANED. | Furnace II | FURNACE 2 TRANSFORMER NO. 2 | |
| 15042 | 22 Sep 2020 | Breakdown Maintenance | DISCHARGE VIBRO FEEDER NO 2 COIL SIDE PLATE DMAGD. WE REPAIRED IT NO WITS OK. | Other | RMHS VIBRO FEEDER | |
| 15043 | 22 Sep 2020 | Breakdown Maintenance | LIMIT SWITCH WIRE REPAIRED. AND LIIT SWITCH CHECKED. | Other | RMHS BELT CONVEYOR NO.1 | |
| 15044 | 21 Sep 2020 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
| Other | RMHS CONVEYOR | |
| 15045 | 21 Sep 2020 | Scheduled Maintenance | ALL VIBRATORS
check the Vibro feeders coil connection, its condition and ensure its working properly with adjusting its vibrations. no 2 discharge conveyor coil changed. now it's working well. | Other | RMHS VIBRO FEEDER | |
| 15046 | 21 Sep 2020 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. greasing of bearings.grease is already there.
2. lubrication of rollers and check conditions.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.BC 2, BC 6 repairs are done.tommorw we change BC 6 belt.
4. gearbox oil level check and if not then fill as per requirement.
5. check coupling and key ( if damaged than inform and change) and do the greasing.BC 2, BC 6 COUPLING CHANGING NEXT TIME.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change. BC6 SIDE ROLLERS FITTING IS DONE.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change. | Other | RMHS CONVEYOR | |
| 15047 | 21 Sep 2020 | Breakdown Maintenance | hoist motor coil born it was removed and sending rewinding | Other | CHIPPING YARD CRANE NO. 1 | |
| 15048 | 21 Sep 2020 | Other | 22 kw submersible U pump connected with 200 v transformer checked the pressure near cooling tower. | Other | SUBMERSIBLE PUMP | |
| 15049 | 21 Sep 2020 | Other | two ceiling fan fixed one is work shop and another one control room | Other | OTHERS | |
| 15050 | 20 Sep 2020 | Breakdown Maintenance | its break not working. we tight it. now its ok. | Other | TAPPING SEC. CRANE NO. 2 | |