#DateTypeDetailsFurnaceEquipmentActions
1504122 Sep 2020Breakdown ShutdownTRANSFORMER TOP SIDE EARTH INSULATOR BUSH OIL LEAKEGED ARRESTED AND CLEANED.Furnace IIFURNACE 2 TRANSFORMER NO. 2
1504222 Sep 2020Breakdown MaintenanceDISCHARGE VIBRO FEEDER NO 2 COIL SIDE PLATE DMAGD. WE REPAIRED IT NO WITS OK.OtherRMHS VIBRO FEEDER
1504322 Sep 2020Breakdown MaintenanceLIMIT SWITCH WIRE REPAIRED. AND LIIT SWITCH CHECKED.OtherRMHS BELT CONVEYOR NO.1
1504421 Sep 2020Scheduled MaintenanceALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

OtherRMHS CONVEYOR
1504521 Sep 2020Scheduled MaintenanceALL VIBRATORS
check the Vibro feeders coil connection, its condition and ensure its working properly with adjusting its vibrations. no 2 discharge conveyor coil changed. now it's working well.
OtherRMHS VIBRO FEEDER
1504621 Sep 2020Scheduled MaintenanceALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. greasing of bearings.grease is already there.
2. lubrication of rollers and check conditions.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.BC 2, BC 6 repairs are done.tommorw we change BC 6 belt.
4. gearbox oil level check and if not then fill as per requirement.
5. check coupling and key ( if damaged than inform and change) and do the greasing.BC 2, BC 6 COUPLING CHANGING NEXT TIME.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change. BC6 SIDE ROLLERS FITTING IS DONE.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change.
OtherRMHS CONVEYOR
1504721 Sep 2020Breakdown Maintenancehoist motor coil born it was removed and sending rewinding OtherCHIPPING YARD CRANE NO. 1
1504821 Sep 2020Other22 kw submersible U pump connected with 200 v transformer checked the pressure near cooling tower.OtherSUBMERSIBLE PUMP
1504921 Sep 2020Othertwo ceiling fan fixed one is work shop and another one control roomOtherOTHERS
1505020 Sep 2020Breakdown Maintenanceits break not working. we tight it. now its ok.OtherTAPPING SEC. CRANE NO. 2