#DateTypeDetailsFurnaceEquipmentActions
1497129 Sep 2020Scheduled Shutdowncleaning and seal side rope fixing for preventing fire.Furnace IFURNACE 1
1497229 Sep 2020Scheduled ShutdownCONTACT CLAMP NO. B5, B6 CHANGED.
B5, B6 A5, AND C2 SIDE TIE ROD CHANGED.
2 NOS. HYDRAULIC PIPE CHANGED.
ELECTRODE 3 SEAL SIDE ROPE TITED.
ELECTRODE 1 SEAL BOX COOLING HOSE PIPE REPAIRED.
Furnace IIFURNACE 2
1497329 Sep 2020Scheduled ShutdownBC 6 SIDE GEAR COUPLING FITTING IS DONE.Other RMHS BELT CONVEYOR NO.6
1497429 Sep 2020Scheduled ShutdownBC 3 GOING ONE SIDE. WE REPAIR IT NOW it's OK.Other RMHS BELT CONVEYOR NO.3
1497529 Sep 2020Breakdown ShutdownF1
TRANSFORMER CLEAN AND SILICA GEL HANGED.

Furnace IFURNACE 1 TRANSFORMER
1497629 Sep 2020Breakdown ShutdownF2
WATER CIRCULATION PUMP N0. 3 STARTER R PHASE LEG DAGED.WE REPAIR IT. NOW it's OK.
TIGHTEN ALL CONNECTIONS. COOLING TOWER PIMP 1 & 2 CHECKED AND TIGHTENED.
Furnace IIWATER MAINEFOLD
1497729 Sep 2020Breakdown Shutdown66 kV TRANSFORMER SECONDARY SIDE 11 KV INSULATOR BUSH R & Y PHSE OIL LEAKAGE ARRESTED AND CLEANED.Other66 KV TRANSFORMER
1497829 Sep 2020Breakdown ShutdownZesco has a power cut. so both furnaces are not working this time. the mechanical and electrical team working on furnaces.OtherOTHERS
1497928 Sep 2020Breakdown Maintenanceits L.T. gearbox gear finish.
WE REPAIR IT. WITH B-63 BELT AND 4 INCH TO 6 INCH PULLEY. NOW it's OK.
OtherTAPPING SEC. CRANE NO. 1
1498028 Sep 2020Scheduled Maintenanceits lt gearbox is damged. we fit one gear box with pilley of 4 to 6 inch and belt no.B 63.

TAPPING SECTION E.O.T. CRANE 1

LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
OtherTAPPING SEC. CRANE NO. 1