| 14971 | 29 Sep 2020 | Scheduled Shutdown | cleaning and seal side rope fixing for preventing fire. | Furnace I | FURNACE 1 | |
| 14972 | 29 Sep 2020 | Scheduled Shutdown | CONTACT CLAMP NO. B5, B6 CHANGED.
B5, B6 A5, AND C2 SIDE TIE ROD CHANGED.
2 NOS. HYDRAULIC PIPE CHANGED.
ELECTRODE 3 SEAL SIDE ROPE TITED.
ELECTRODE 1 SEAL BOX COOLING HOSE PIPE REPAIRED. | Furnace II | FURNACE 2 | |
| 14973 | 29 Sep 2020 | Scheduled Shutdown | BC 6 SIDE GEAR COUPLING FITTING IS DONE. | Other | RMHS BELT CONVEYOR NO.6 | |
| 14974 | 29 Sep 2020 | Scheduled Shutdown | BC 3 GOING ONE SIDE. WE REPAIR IT NOW it's OK. | Other | RMHS BELT CONVEYOR NO.3 | |
| 14975 | 29 Sep 2020 | Breakdown Shutdown | F1
TRANSFORMER CLEAN AND SILICA GEL HANGED.
| Furnace I | FURNACE 1 TRANSFORMER | |
| 14976 | 29 Sep 2020 | Breakdown Shutdown | F2
WATER CIRCULATION PUMP N0. 3 STARTER R PHASE LEG DAGED.WE REPAIR IT. NOW it's OK.
TIGHTEN ALL CONNECTIONS. COOLING TOWER PIMP 1 & 2 CHECKED AND TIGHTENED. | Furnace II | WATER MAINEFOLD | |
| 14977 | 29 Sep 2020 | Breakdown Shutdown | 66 kV TRANSFORMER SECONDARY SIDE 11 KV INSULATOR BUSH R & Y PHSE OIL LEAKAGE ARRESTED AND CLEANED. | Other | 66 KV TRANSFORMER | |
| 14978 | 29 Sep 2020 | Breakdown Shutdown | Zesco has a power cut. so both furnaces are not working this time. the mechanical and electrical team working on furnaces. | Other | OTHERS | |
| 14979 | 28 Sep 2020 | Breakdown Maintenance | its L.T. gearbox gear finish.
WE REPAIR IT. WITH B-63 BELT AND 4 INCH TO 6 INCH PULLEY. NOW it's OK. | Other | TAPPING SEC. CRANE NO. 1 | |
| 14980 | 28 Sep 2020 | Scheduled Maintenance | its lt gearbox is damged. we fit one gear box with pilley of 4 to 6 inch and belt no.B 63.
TAPPING SECTION E.O.T. CRANE 1
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.
CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.
HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
| Other | TAPPING SEC. CRANE NO. 1 | |