| 14931 | 02 Oct 2020 | Scheduled Maintenance | 1. check the water manifold line, T section, and valves. it's ok.
2. check leakage of hose pipes. no leakage. | Furnace I | WATER MAINEFOLD | |
| 14932 | 02 Oct 2020 | Scheduled Maintenance | 1. check the water manifold line, T section, and valves. it's not ok. 1 valve is leaked. on the next schedule shutdown, we will change it.
2. check leakage of hose pipes.its ok. | Furnace II | WATER MAINEFOLD | |
| 14933 | 02 Oct 2020 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.clean.
2. check leakage of hydraulic oil. if it is then informed to HOD.
it's ok. no leakage. | Furnace I | ELECTRODE 2 | |
| 14934 | 02 Oct 2020 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders. clean.
2. check leakage of hydraulic oil. if it is then informed to HOD.
no leakage. | Furnace I | ELECTRODE 3 | |
| 14935 | 02 Oct 2020 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.clean.
2. check leakage of hydraulic oil. if it is then informed to HOD.
its hydraulic clamping cylinder is leaked. we have changed it. now it's ok. | Furnace I | ELECTRODE 1 | |
| 14936 | 02 Oct 2020 | Breakdown Maintenance | its upper clamping cylinder catching fire. we use fire extension to control it. now its ok. | Furnace I | ELECTRODE 1 | |
| 14937 | 02 Oct 2020 | Breakdown Shutdown | when we checked it. we found that its lower clamping cylinder has leakage from the cylinder piston. then we change it with a spare one. now it's ok. | Furnace I | ELECTRODE 1 | |
| 14938 | 02 Oct 2020 | Breakdown Maintenance | its hoist motor taking high current we lose the break and repair it. now it taking 11 amp with the load. | Other | TAPPING SEC. CRANE NO. 3 | |
| 14939 | 02 Oct 2020 | Scheduled Maintenance | electrode blower spare
repaired and tested. | Other | cooling blower spare | |
| 14940 | 01 Oct 2020 | Scheduled Maintenance | FURNACE SEAL PROTECTION SHIELD FABRICATION WORK IS IN complete. now we will fit it to furnace. | Furnace I | PROTECTION SHIELD | |