| 14921 | 02 Oct 2020 | Scheduled Maintenance | ELECTRODE BLOWER 3
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 3 | |
| 14922 | 02 Oct 2020 | Scheduled Maintenance | FURNACE 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.its ok. | Furnace II | HYDRAULIC POWER PACK NO. 1 | |
| 14923 | 02 Oct 2020 | Scheduled Maintenance | FURNACE 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.its ok. | Furnace II | HYDRAULIC POWER PACK NO. 2 | |
| 14924 | 02 Oct 2020 | Scheduled Maintenance | 1.check transformer temp. and oil level.its ok.
2. check transformer oil leakage.it's ok.
3. check crystal color. it's ok. | Furnace II | FURNACE 2 TRANSFORMER NO. 1 ( GROUND FLOOR) | |
| 14925 | 02 Oct 2020 | Scheduled Maintenance | 1.check transformer temp. and oil level.it is ok. temp. is good.
2. check transformer oil leakage.no leakage.
3. check crystal color.it is ok. | Furnace II | FURNACE 2 TRANSFORMER NO. 2 | |
| 14926 | 02 Oct 2020 | Scheduled Maintenance | 1.check transformer temp. and oil level.it is ok. temp. is good.
2. check transformer oil leakage.no leakage.
3. check crystal color.it is ok. | Furnace I | FURNACE 1 TRANSFORMER | |
| 14927 | 02 Oct 2020 | Scheduled Maintenance | 1.check solenoid valve condition and its pipe condition.checked and repaired 2 valves.
2.check pneumatic cylinders and air supply lines.its ok.
3. check the charging chute lekage. if it is then inform HOD. | Furnace I | CHARGING CHUTES | |
| 14928 | 02 Oct 2020 | Scheduled Maintenance | 1.check solenoid valve condition and its pipe condition. one valve not working we repaired it. now it's ok.
2.check pneumatic cylinders and air supply line. it's ok.
3. check to charge chute lekage. if it is than inform HOD. a small amount of leakage. we will do it in the next schedule shut down. | Furnace II | CHARGING CHUTES | |
| 14929 | 02 Oct 2020 | Scheduled Maintenance | 1. checking loose parts and check the hydraulic oil level in the tank. checked we will put oil tomorrow.
2. check solenoid valve working conditions and adjust oil pressure. its ok.
3. check hydraulic line leakage. we have changed one cylinder at ele. 1 clamping cyl. | Furnace I | HYDRAULIC POWER PACK NO. 1 | |
| 14930 | 02 Oct 2020 | Scheduled Maintenance | 1. checking loose parts and check the hydraulic oil level in the tank.its oil level is ok.
2. check solenoid valve working conditions and adjust oil pressure. solenoid valves are ok.
3. check hydraulic line leakage.no leakage. | Furnace II | HYDRAULIC POWER PACK NO. 2 | |