| 14911 | 03 Oct 2020 | Scheduled Maintenance | clean, blowing and emergency switch with siren fixed. now it's ok. | Other | TAPPING SEC. CRANE NO. 2 | |
| 14912 | 03 Oct 2020 | Scheduled Shutdown | its second-floor side 4 nos and taphole no. 1 side 2 lights fitting is done. | Furnace I | LAMP | |
| 14913 | 03 Oct 2020 | Scheduled Shutdown | its pollution water tank cleaned and water filling is done. | Furnace II | POLLUTION 2 | |
| 14914 | 02 Oct 2020 | Scheduled Maintenance | F1- ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.its ok.
2. check panel board, clean, & tight all loose parts.clean and tested.
3. all parts clean by hand blower.
| Furnace I | ELECTRODE 1 | |
| 14915 | 02 Oct 2020 | Scheduled Maintenance | F1- ELECTRODE BLOWER 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower. | Furnace I | ELECTRODE 2 | |
| 14916 | 02 Oct 2020 | Scheduled Maintenance | F1- ELECTRODE BLOWER 3
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
| Furnace I | ELECTRODE 3 | |
| 14917 | 02 Oct 2020 | Scheduled Maintenance | FURNACE 1
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.its ok.
| Furnace I | HYDRAULIC POWER PACK NO. 1 | |
| 14918 | 02 Oct 2020 | Scheduled Maintenance | FURNACE 1
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.its ok.
| Furnace I | HYDRAULIC POWER PACK NO. 2 | |
| 14919 | 02 Oct 2020 | Scheduled Maintenance | ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 1 | |
| 14920 | 02 Oct 2020 | Scheduled Maintenance | ELECTRODE BLOWER 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.it is ok.
2. check panel board, clean, & tight all loose parts.clean and tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 2 | |