| 14881 | 07 Oct 2020 | Scheduled Maintenance | its testing is done. it's ok now. | Other | CHIPPING YARD CRANE NO. 2 | |
| 14882 | 06 Oct 2020 | Scheduled Maintenance | no maintenance because of furnace and compressor testing side working.
WATER CIRCULATION PUMP 1,2,3,
FURNACE 1
GRANULATION PUMP 1,2
SUBMERSIBLE PUMP 1,2,
POLLUTION WATER PUMP NO 1
FURNACE 2
GRANULATION PUMP 1,2,
POLLUTION WATER PUMP NO 1,
OFFICE SUBMERSIBLE PUMP 1,
WASHING PLANT SUBMERSIBLE PUMP 1
1. check the pump condition and check discharge.
2. check coupling condition, alignment, and do greasing.
3. check pipelines and valve's condition.
4. check cooling towers nozzles condition.
| Other | PUMP | |
| 14883 | 06 Oct 2020 | Scheduled Maintenance | workshop and washing plant compressor testing is done. now its ok. | Other | COMPRESSOR | |
| 14884 | 05 Oct 2020 | Scheduled Maintenance | not done because of furnace is shutdown.
ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
| Other | RMHS CONVEYOR | |
| 14885 | 05 Oct 2020 | Scheduled Maintenance | Not done because we working finance side.
ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
| Other | RMHS CONVEYOR | |
| 14886 | 05 Oct 2020 | Scheduled Maintenance | Not done because we working furnace side
ALL VIBRATORS
check Vibro feeders coil connection, its condition and ensure its working properly with adjusting its vibrations. | Other | RMHS VIBRO FEEDER | |
| 14887 | 05 Oct 2020 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. greasing of bearings.grease already there.
2. lubrication of rollers and check conditions.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.belt is ok.
4. gearbox oil level check and if not then fill as per requirement.
5. check coupling and key ( if damaged than inform and change) and do the greasing.BC 5 key is damaged. We repairing it tomorrow.
6. check the drum condition.BC 7 belt drum changed.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change.
| Other | RMHS CONVEYOR | |
| 14888 | 05 Oct 2020 | Breakdown Maintenance | not done. due to furnace side working.
F1- GRANULATION MOTOR 1,2 WATER CIRCULATION PUMP MOTOR 1,2,3, SUBMERSIBLE PUMP MOTOR 1,2, POLLUTION WATER PUMP MOTOR
NO 1
F2- GRANULATION MOTOR 1,2, POLLUTION WATER PUMP MOTOR NO 1, OFFICE SUBMERSIBLE PUMP MOTOR 1,
WASHING PLANT SUBMERSIBLE PUMP MOTOR1
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. water circulation pump motor greasing.
| Other | PUMP | |
| 14889 | 05 Oct 2020 | Breakdown Maintenance | Big gurinder not working. Open and carbon brush changed. | Other | BIG HAND GRINDER | |
| 14890 | 05 Oct 2020 | Breakdown Maintenance | Big grinder not working. Open and carbon brush changed. | Other | BIG HAND GRINDER | |