1485109 Oct 2020Scheduled Maintenanceno maintenance due to all guys busy in furnace.
1.check solenoid valve condition and its pipe condition.
2.check pneumatic cylinders and air supply line.
3. check charging chute lekage. if it is than inform HOD.
Furnace IICHARGING CHUTES
1485209 Oct 2020Scheduled Maintenanceno maintenance due to all guys busy in furnace.
1. checking loose parts and check the hydraulic oil level in the tank.
2. check solenoid valve working conditions and adjust oil pressure.
3. check hydraulic line leakage.
Furnace IHYDRAULIC POWER PACK NO. 1
1485309 Oct 2020Scheduled Maintenanceno maintenance due to all guys busy in furnace.
1. checking loose parts and check the hydraulic oil level in the tank.
2. check solenoid valve working conditions and adjust oil pressure.
3. check hydraulic line leakage.
Furnace IIHYDRAULIC POWER PACK NO. 2
1485409 Oct 2020Scheduled Maintenanceno maintenance due to all guys busy in furnace.
1. check the water manifold line, T section, and valves.
2. check leakage of hose pipes.
Furnace IWATER MAINEFOLD
1485509 Oct 2020Scheduled Maintenanceno maintenance due to all guys busy in furnace.
1. check the water manifold line, T section, and valves.
2. check leakage of hose pipes.
Furnace IIWATER MAINEFOLD
1485609 Oct 2020Scheduled Maintenanceno maintenance due to all guys busy in pollution.
1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD.
Furnace IELECTRODE 2
1485709 Oct 2020Scheduled Maintenanceno maintenance due to all guys busy in pollution.
1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD.
Furnace IELECTRODE 3
1485809 Oct 2020Scheduled Maintenanceno maintenance due to all guys busy in pollution. and furnace maintenance

1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD.
Furnace IELECTRODE 1
1485908 Oct 2020Scheduled Maintenanceclean already.
POLLUTION ID FANS (Furnace 1)
1. open cover and clean dust.
2. check the balancing of impeller and vibration isolation.
3. check v belts condition and inform if its on critical stage.
4. check foundation bolts and nuts of Plummer blocks.
5. greasing the Plummer blocks.
6. check the duct condition and remove dust from the duct.
7. check stack condition and check its temperature.
OtherPOLLUTION 1
1486008 Oct 2020Scheduled Maintenanceclean and start.
POLLUTION ID FANS FOR (Furnace 2)
1. open cover and clean dust.
2. check the balancing of impeller and vibration isolation.
3. check v belts condition and inform if its on critical stage.
4. check foundation bolts and nuts of Plummer blocks.
5. greasing the Plummer blocks.
6. check the duct condition and remove dust from the duct.
7. check stack condition and check its temperature.
OtherPOLLUTION 2