| 14711 | 28 Oct 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 3
LT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
CT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
HT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
| Other | TAPPING SEC. CRANE NO. 3 | |
| 14712 | 28 Oct 2020 | Scheduled Maintenance | 3RD FLOOR CARBON PASTE LIFTING CRANE
LT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
CT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
HT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
| Other | CARBON PASTE LIFTING CRANE | |
| 14713 | 27 Oct 2020 | Scheduled Shutdown | It's heat exchanger mounting and oil filling is done.we start the oil supply. | Furnace I | FURNACE 1 TRANSFORMER | |
| 14714 | 27 Oct 2020 | Breakdown Maintenance | It's front chute is damaged. We fully cut it and make new one.now it's working. | Other | VIBRATOR SCREEN MACHINE ( WASHING PLANT) | |
| 14715 | 27 Oct 2020 | Breakdown Maintenance | When we checking it we found that its have a big hole. We repaire it. Now.its ok. | Other | RMHS BELT CONVEYOR NO.7 | |
| 14716 | 27 Oct 2020 | Breakdown Maintenance | We fitting plate at chute side to control the charge flow. | Other | RMHS VIBRO FEEDER | |
| 14717 | 27 Oct 2020 | Scheduled Maintenance | NO MAINTENANCE BECAUSE OF FURNACE 1 POLLUTION SIDE WORKING.
WATER CIRCULATION PUMP 1,2,3,
FURNACE 1
GRANULATION PUMP 1,2
SUBMERSIBLE PUMP 1,2,
POLLUTION WATER PUMP NO 1
FURNACE 2
GRANULATION PUMP 1,2,
POLLUTION WATER PUMP NO 1,
OFFICE SUBMERSIBLE PUMP 1,
WASHING PLANT SUBMERSIBLE PUMP 1
1. check the pump condition and check discharge.
2. check coupling condition, alignment, and do greasing.
3. check pipelines and valve's condition.
4. check cooling towers nozzles condition.
| Other | PUMP | |
| 14718 | 27 Oct 2020 | Scheduled Maintenance | F1- GRANULATION MOTOR 1,2 WATER CIRCULATION PUMP MOTOR 1,2,3, SUBMERSIBLE PUMP MOTOR 1,2, POLLUTION WATER PUMP MOTOR
NO 1
F2- GRANULATION MOTOR 1,2, POLLUTION WATER PUMP MOTOR NO 1, OFFICE SUBMERSIBLE PUMP MOTOR 1,
WASHING PLANT SUBMERSIBLE PUMP MOTOR1
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. water circulation pump motor greasing.
| Other | PUMP | |
| 14719 | 26 Oct 2020 | Breakdown Shutdown | It's C3 clamp has leakage after sparking. We change it with mopepetwe clamp. Now it's ok. | Furnace II | ELECTRODE 3 | |
| 14720 | 26 Oct 2020 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
| Other | RMHS CONVEYOR | |