Maintenance Report

Search Filter:

Showing 14,711-14,720 of 17,159 items.

#DateTypeDetailsFurnaceEquipmentActions
1471128 Oct 2020Scheduled MaintenanceTAPPING SECTION E.O.T. CRANE 3

LT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

CT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

HT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
OtherTAPPING SEC. CRANE NO. 3
1471228 Oct 2020Scheduled Maintenance3RD FLOOR CARBON PASTE LIFTING CRANE

LT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

CT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

HT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
OtherCARBON PASTE LIFTING CRANE
1471327 Oct 2020Scheduled ShutdownIt's heat exchanger mounting and oil filling is done.we start the oil supply.Furnace IFURNACE 1 TRANSFORMER
1471427 Oct 2020Breakdown MaintenanceIt's front chute is damaged. We fully cut it and make new one.now it's working.OtherVIBRATOR SCREEN MACHINE ( WASHING PLANT)
1471527 Oct 2020Breakdown MaintenanceWhen we checking it we found that its have a big hole. We repaire it. Now.its ok.Other RMHS BELT CONVEYOR NO.7
1471627 Oct 2020Breakdown MaintenanceWe fitting plate at chute side to control the charge flow.OtherRMHS VIBRO FEEDER
1471727 Oct 2020Scheduled MaintenanceNO MAINTENANCE BECAUSE OF FURNACE 1 POLLUTION SIDE WORKING.
WATER CIRCULATION PUMP 1,2,3,
FURNACE 1
GRANULATION PUMP 1,2
SUBMERSIBLE PUMP 1,2,
POLLUTION WATER PUMP NO 1

FURNACE 2
GRANULATION PUMP 1,2,
POLLUTION WATER PUMP NO 1,
OFFICE SUBMERSIBLE PUMP 1,
WASHING PLANT SUBMERSIBLE PUMP 1

1. check the pump condition and check discharge.
2. check coupling condition, alignment, and do greasing.
3. check pipelines and valve's condition.
4. check cooling towers nozzles condition.
OtherPUMP
1471827 Oct 2020Scheduled MaintenanceF1- GRANULATION MOTOR 1,2 WATER CIRCULATION PUMP MOTOR 1,2,3, SUBMERSIBLE PUMP MOTOR 1,2, POLLUTION WATER PUMP MOTOR
NO 1

F2- GRANULATION MOTOR 1,2, POLLUTION WATER PUMP MOTOR NO 1, OFFICE SUBMERSIBLE PUMP MOTOR 1,
WASHING PLANT SUBMERSIBLE PUMP MOTOR1

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. water circulation pump motor greasing.
OtherPUMP
1471926 Oct 2020Breakdown ShutdownIt's C3 clamp has leakage after sparking. We change it with mopepetwe clamp. Now it's ok.Furnace IIELECTRODE 3
1472026 Oct 2020Scheduled MaintenanceALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

OtherRMHS CONVEYOR