| 14671 | 30 Oct 2020 | Scheduled Maintenance | F1- ELECTRODE BLOWER 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace I | ELECTRODE 2 | |
| 14672 | 30 Oct 2020 | Scheduled Maintenance | F1- ELECTRODE BLOWER 3
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace I | ELECTRODE 3 | |
| 14673 | 30 Oct 2020 | Scheduled Maintenance | FURNACE 1
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
| Furnace I | HYDRAULIC POWER PACK NO. 1 | |
| 14674 | 30 Oct 2020 | Scheduled Maintenance | FURNACE 1
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
| Furnace I | HYDRAULIC POWER PACK NO. 2 | |
| 14675 | 30 Oct 2020 | Scheduled Maintenance | ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace II | ELECTRODE 1 | |
| 14676 | 30 Oct 2020 | Scheduled Maintenance | ELECTRODE BLOWER 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 2 | |
| 14677 | 30 Oct 2020 | Scheduled Maintenance | ELECTRODE BLOWER 3
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 3 | |
| 14678 | 30 Oct 2020 | Scheduled Maintenance | FURNACE 2
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves. | Furnace II | HYDRAULIC POWER PACK NO. 1 | |
| 14679 | 30 Oct 2020 | Scheduled Maintenance | FURNACE 2
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves. | Furnace II | HYDRAULIC POWER PACK NO. 2 | |
| 14680 | 30 Oct 2020 | Scheduled Maintenance | 1.check transformer temp. and oil level.
2. check transformer oil leakage.
3. check crystal color. | Furnace II | FURNACE 2 TRANSFORMER NO. 1 ( GROUND FLOOR) | |