| 14651 | 02 Nov 2020 | Breakdown Shutdown | its contact clamp no. C4 has leakage. we change it. now its ok. | Furnace II | ELECTRODE 3 | |
| 14652 | 02 Nov 2020 | Breakdown Shutdown | It's clamp no. A3 TIE ROD BOLT, TIE ROD AND ALL SUPPORTING BOLTS AND DAMAGED. WE OPEN PRESSURE RING BOLTS WHICH IS ALREADY DAMGED. THAN WE CHANGE PRESSURE RING BOLT, TIE ROD AND SUPPORTING BOLT. | Furnace II | ELECTRODE 1 | |
| 14653 | 02 Nov 2020 | Scheduled Maintenance | ITS CONVEYOR BELTS ARE DAMGED. WE REPAIR IT. NOW it's OK. | Other | WASHING PLANT | |
| 14654 | 02 Nov 2020 | Breakdown Maintenance | ITS SHAFT IS DAMAGED. WE REPAIR IT. NOW ITS OK. | Other | CHIPPING YARD CRANE NO. 1 | |
| 14655 | 02 Nov 2020 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
| Other | RMHS CONVEYOR | |
| 14656 | 02 Nov 2020 | Scheduled Maintenance | ALL VIBRATORS
check Vibro feeders coil connection, its condition and ensure its working properly with adjusting its vibrations. | Other | RMHS VIBRO FEEDER | |
| 14657 | 02 Nov 2020 | Scheduled Maintenance | NO MAINTENANCE BECAUSE of F2 SIED WORKING.
ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. greasing of bearings.
2. lubrication of rollers and check conditions.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.
4. gearbox oil level check and if not then fill as per requirement.
5. check coupling and key ( if damaged than inform and change) and do the greasing.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change.
| Other | RMHS CONVEYOR | |
| 14658 | 01 Nov 2020 | Breakdown Maintenance | It's one heat exchanger is leaked. We remove it and bring it to the workshop for repairing. its repairing is done.we fit it. now its ok. | Furnace I | FURNACE 1 TRANSFORMER | |
| 14659 | 01 Nov 2020 | Scheduled Maintenance | ITS POLLUTION FUME UPDATE SYSTEM WORK IS COMPLETE.
NOW it's WORKING. | Other | POLLUTION FUME SYSTEM | |
| 14660 | 31 Oct 2020 | Breakdown Maintenance | its motor winding is damged. we removing it and giving to rewinding.
rewinding Is done. | Other | CHIPPING YARD CRANE NO. 1 | |