| 14601 | 06 Nov 2020 | Breakdown Maintenance | Its L.T. SIDE BOLTS COMMING OUT. We repair it. Now its ok. | Other | TAPPING SEC. CRANE NO. 1 | |
| 14602 | 06 Nov 2020 | Breakdown Maintenance | When we checking we found that one hole on the joint side. Its repairing work is done. now it's ok. | Other | RMHS BELT CONVEYOR NO.5 | |
| 14603 | 06 Nov 2020 | Breakdown Maintenance | It's current controlling rod is damage. We repaired it. Now it's ok. | Other | WELDING MACHINE | |
| 14604 | 06 Nov 2020 | Breakdown Maintenance | It's clamp no. B1 and B2 HAS water leakage. We putting pulp. Now it's ok. | Furnace II | ELECTRODE 2 | |
| 14605 | 06 Nov 2020 | Breakdown Maintenance | It's clamp no. A3 has water leakage. We putting pulp 3 times. Now it's ok. | Furnace II | ELECTRODE 1 | |
| 14606 | 06 Nov 2020 | Breakdown Shutdown | its contact clamp no. A3 and A6 have lekage. we putting pulp than A6 leakage is stopped. but A3 is not stooped so we change pipeline on transformer than we starting water with putting pulp. now its ok. | Furnace II | ELECTRODE 1 | |
| 14607 | 06 Nov 2020 | Scheduled Maintenance | F1- ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace I | ELECTRODE 1 | |
| 14608 | 06 Nov 2020 | Scheduled Maintenance | F1- ELECTRODE BLOWER 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace I | ELECTRODE 2 | |
| 14609 | 06 Nov 2020 | Scheduled Maintenance | F1- ELECTRODE BLOWER 3
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace I | ELECTRODE 3 | |
| 14610 | 06 Nov 2020 | Scheduled Maintenance | FURNACE 1
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
| Furnace I | HYDRAULIC POWER PACK NO. 1 | |