| 14581 | 11 Nov 2020 | Scheduled Maintenance | 3RD FLOOR CARBON PASTE LIFTING CRANE
LT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
CT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
HT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
| Other | CARBON PASTE LIFTING CRANE | |
| 14582 | 10 Nov 2020 | Breakdown Shutdown | During slipping It's electrode 2 also lifted. We going for checking than we find out that it's lower clamp mantle is damaged. We repaired it by welding. Now it's ok. | Furnace I | ELECTRODE 2 | |
| 14583 | 10 Nov 2020 | Breakdown Maintenance | Its break is loose. We open the back cover of motor and tight the break. Now its ok. | Other | CHIPPING YARD CRANE NO. 2 | |
| 14584 | 10 Nov 2020 | Breakdown Maintenance | It's shell welding remaining work is done 50 %. | Other | FURNACE 1 | |
| 14585 | 10 Nov 2020 | Scheduled Maintenance | WATER CIRCULATION PUMP 1. it is ok we greasing motor and coupling.
FURNACE 1
GRANULATION PUMP 1,2. it is ok. we greasing coupling. but pump 1 impeller condition is not ok.
SUBMERSIBLE PUMP 1,2. it is running.
POLLUTION WATER PUMP NO 1. we change gland rope due to leakage of water.now it is ok.
FURNACE 2
GRANULATION PUMP 1,2. check coupling condition and greasing is done.
POLLUTION WATER PUMP NO 1. check it. it is ok.
OFFICE SUBMERSIBLE PUMP 1. it's running.
WASHING PLANT SUBMERSIBLE PUMP 1. it is running.
1. check the pump condition and check discharge.
2. check coupling condition, alignment, and do greasing.
3. check pipelines and valve's condition.
4. check cooling towers nozzles condition.
COOLING TOWER PIPELINE IS OK. AND ALL NOZZLE IS IN GOOD CONDITION. | Other | PUMP | |
| 14586 | 10 Nov 2020 | Scheduled Maintenance | F1- GRANULATION MOTOR 1,2 WATER CIRCULATION PUMP MOTOR 1,2,3, SUBMERSIBLE PUMP MOTOR 1,2, POLLUTION WATER PUMP MOTOR
NO 1
F2- GRANULATION MOTOR 1,2, POLLUTION WATER PUMP MOTOR NO 1, OFFICE SUBMERSIBLE PUMP MOTOR 1,
WASHING PLANT SUBMERSIBLE PUMP MOTOR1
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. water circulation pump motor greasing.
| Other | PUMP | |
| 14587 | 09 Nov 2020 | Breakdown Shutdown | It's shell welding is damaged. We use 7018 rod for welding. Now it's ok.we do the remaining work when furnace is on. | Furnace I | FURNACE 1 | |
| 14588 | 09 Nov 2020 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
| Other | RMHS CONVEYOR | |
| 14589 | 09 Nov 2020 | Scheduled Maintenance | ALL VIBRATORS
check Vibro feeders coil connection, its condition and ensure its working properly with adjusting its vibrations. | Other | RMHS VIBRO FEEDER | |
| 14590 | 09 Nov 2020 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. greasing of bearings. grease is done.
2. lubrication of rollers and check conditions. its ok.
3. check belt status ( if damaged than inform and change) and also check tightness, speed. BC 6 and BC 2 belt condition is not ok. we need to change it.
4. gearbox oil level check and if not then fill as per requirement. its ok.
5. check coupling and key ( if damaged than inform and change) and do the greasing.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change.
| Other | RMHS CONVEYOR | |