| 14551 | 13 Nov 2020 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders. It's OK.
2. check leakage of hydraulic oil. if it is then informed to HOD. IT'S ONE CYLINDER HAS SMALL AMOUNT OF LEAKAGE. | Furnace I | ELECTRODE 2 | |
| 14552 | 13 Nov 2020 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.ITS OK.
2. check leakage of hydraulic oil. if it is then informed to HOD.NO LEAKAGE. | Furnace I | ELECTRODE 3 | |
| 14553 | 13 Nov 2020 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.CLEAN.
2. check leakage of hydraulic oil. if it is then informed to HOD. NO LEAKAGE. | Furnace I | ELECTRODE 1 | |
| 14554 | 12 Nov 2020 | Breakdown Maintenance | It's vibrator mesh coming out. It's repairing work is done. Now it's ok. | Other | VIBRATOR SCREEN MACHINE ( WASHING PLANT) | |
| 14555 | 12 Nov 2020 | Breakdown Maintenance | It's shell welding remaining work is done 80% | Furnace I | FURNACE 1 | |
| 14556 | 12 Nov 2020 | Breakdown Shutdown | It's sliping cylinder has leakage. We try to tight the bolts for stoping leakage.but the leakage is not stopped. So we change it. Now it's ok. | Furnace I | ELECTRODE 3 | |
| 14557 | 12 Nov 2020 | Breakdown Shutdown | It's electrode is broken around 1.50 mtr
We removing it by chain block. Now it's ok. | Furnace I | ELECTRODE 1 | |
| 14558 | 12 Nov 2020 | Breakdown Maintenance | It's C.T. belt is loose. We tight it. Now.its ok. | Other | TAPPING SEC. CRANE NO. 1 | |
| 14559 | 12 Nov 2020 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 1
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.checked and greasing is done.
2. check the gearbox oil level, leakage, and fill if required. we found leakage so we fill some amount of grease.
3. check all fasteners and mounting bolts. it is ok.
4. check frame welding conditions. it is not ok. its shaft condition is not good. we need to change it.
5. check end traveling gears condition and do the greasing. it is ok.
CT.
gears are ok. it is good in condition.
HT. ITS PULLY CHANGED.
1. check rope drum, hook, rope condition. greasing of rope. rope greasing is done. it is in good condition.
2. check the thruster drum condition and its brake tightness.no thruster.
3. check all fasteners and mounting bolts. it is ok.
4. check frame welding conditions.it is ok. | Other | CHIPPING YARD CRANE NO. 1 | |
| 14560 | 12 Nov 2020 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 2
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing. greasing is done. it is ok.
2. check the gearbox oil level, leakage, and fill if required. no leakage but we fill grease.
3. check all fasteners and mounting bolts. it is ok.
4. check frame welding conditions. it is ok.
5. check end traveling gears condition and do the greasing.
CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing. greasing is done. it is ok.
2. check the gearbox oil level, leakage, and fill if required. no leakage but we fill grease.
3. check all fasteners and mounting bolts. it is ok.
4. check frame welding conditions. it is ok.
5. check end traveling gears condition and do the greasing.it is ok. greasing is done.
HT.
1. check rope drum, hook, rope condition. greasing of rope. greasing is done. we found that it is damage. we open and repaired.
2. check the thruster drum condition and its brake tightness. no thruster.
3. check all fasteners and mounting bolts. It is ok.
4. check frame welding conditions.it is ok. | Other | CHIPPING YARD CRANE NO. 2 | |