| 14521 | 14 Nov 2020 | Breakdown Maintenance | It's A4, A6 CLAMP has leakage. We put pulp for control the leakage. Now it's ok. | Furnace II | ELECTRODE 1 | |
| 14522 | 14 Nov 2020 | Breakdown Maintenance | It's B1, B2, B3, B4, B6 clamps have leakage. We put pulp for controlling the leakage. Now it's ok. | Furnace II | ELECTRODE 2 | |
| 14523 | 14 Nov 2020 | Breakdown Shutdown | It's slipping is not done. We going for checking that it's lower clamp cylinder bolt is damaged. We repair it. Now it's ok. | Furnace I | ELECTRODE 2 | |
| 14524 | 14 Nov 2020 | Breakdown Shutdown | It's slipping cylinder bolt is damage. We weld it. Also it's solenoid valves 2 nos. Not working. We open it and repair it.now it's ok. | Furnace I | ELECTRODE 3 | |
| 14525 | 14 Nov 2020 | Breakdown Shutdown | Its electrode 2 has speaking problem. We switch off furnace to tight bolts with clay and paste. Now its ok. | Furnace I | ELECTRODE 2 | |
| 14526 | 14 Nov 2020 | Scheduled Maintenance | Crusher out from washing plant. open and it's plate out. We weld 25 mm plate for support. Bearing open and clean. Than we fixed it on frame. Night guys making chute for crusher.
TILTING HOPPER
1. greasing all bushes.
2.hydraulic pump and motor coupling.
3. checking the hydraulic oil level and if not then fill.
4. check hopper welding sections.
CONVEYOR NO 1
1. greasing of bearings.
2. lubrication of rollers and check conditions.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.
4. gearbox oil level check and if not then fill as per requirement.
5. check coupling and key ( if damaged than inform and change) and do the greasing.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change.
CRUSHER
1. check the crusher foundation.
2. check V belts condition.
3. do greasing.
4. check spring rod condition and gap between plates.
VIBRATOR
1. check the spring condition.
2. check V belts condition.
3. check vibrations if not good then adjust.
4. check the frame welding condition.
ROLLER
1. check roller speed.
2.greasing of bearings.
3.gearbox oil level check and if not then fill as per requirement.
4. check coupling and key ( if damaged than inform and change) and do the greasing.
5. check the drum condition.
6. check the mounting frame welding condition.
DISCHARGE CONVEYOR
1. greasing of bearings.
2. lubrication of rollers and check conditions.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.
4. gearbox oil level check and if not then fill as per requirement.
5. check coupling and key ( if damaged than inform and change) and do the greasing.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change. | Other | WASHING PLANT | |
| 14527 | 14 Nov 2020 | Scheduled Maintenance | WASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
5. check the high mast lights also. | Other | WASHING PLANT | |
| 14528 | 13 Nov 2020 | Breakdown Maintenance | It's puMp has a leakage from gland side. We fix it with 4 nos. Gland rope. Now it's ok. | Other | WATER PUMP (WASHING PLANT) | |
| 14529 | 13 Nov 2020 | Breakdown Maintenance | It's pump has a water leakage. We fix it. Now it's ok. | Other | POLLUTION 2 | |
| 14530 | 13 Nov 2020 | Breakdown Maintenance | It's side rubber is finish. We repaired it and also we extend the plate where from material is coming on the conveyor. | Other | RMHS BELT CONVEYOR NO.4 | |