#DateTypeDetailsFurnaceEquipmentActions
1451118 Nov 2020Breakdown MaintenanceTAPPING SECTION E.O.T. CRANE 3

LT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

CT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

HT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
OtherTAPPING SEC. CRANE NO. 3
1451218 Nov 2020Scheduled Maintenance3RD FLOOR CARBON PASTE LIFTING CRANE

LT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

CT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

HT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
OtherCARBON PASTE LIFTING CRANE
1451318 Nov 2020Breakdown Shutdownits electrode 1 has a sparking problem. when we check it we found that it's clamp no. A3 bolts damage and clamp come down. we change 3 nos bolt with a fork and we put all clamps side paste and clay. we change its pressure bolts.Furnace IIELECTRODE 1
1451417 Nov 2020Scheduled MaintenanceWATER CIRCULATION PUMP 1,2,3,
FURNACE 1
GRANULATION PUMP 1,2
SUBMERSIBLE PUMP 1,2,
POLLUTION WATER PUMP NO 1

FURNACE 2
GRANULATION PUMP 1,2,
POLLUTION WATER PUMP NO 1,
OFFICE SUBMERSIBLE PUMP 1,
WASHING PLANT SUBMERSIBLE PUMP 1

1. check the pump condition and check discharge.it is ok. We fit the f1 pollution pump is off due to pollution pipe line work is in progress.
2. check coupling condition, alignment, and do greasing.it is ok.
3. check pipelines and valve's condition.
4. check cooling towers nozzles condition.it Is ok.
OtherPUMP
1451517 Nov 2020Scheduled MaintenanceF1- GRANULATION MOTOR 1,2 WATER CIRCULATION PUMP MOTOR 1,2,3, SUBMERSIBLE PUMP MOTOR 1,2, POLLUTION WATER PUMP MOTOR
NO 1

F2- GRANULATION MOTOR 1,2, POLLUTION WATER PUMP MOTOR NO 1, OFFICE SUBMERSIBLE PUMP MOTOR 1,
WASHING PLANT SUBMERSIBLE PUMP MOTOR1

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. water circulation pump motor greasing.
OtherPUMP
1451617 Nov 2020Scheduled MaintenanceBC 6 belt condition is not good. we change it. its total length is 18700mm and width is 650 mm.Other RMHS BELT CONVEYOR NO.6
1451716 Nov 2020Scheduled MaintenanceALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

OtherRMHS CONVEYOR
1451816 Nov 2020Scheduled MaintenanceALL VIBRATORS
check Vibro feeders coil connection, its condition and ensure its working properly with adjusting its vibrations.
OtherRMHS VIBRO FEEDER
1451916 Nov 2020Scheduled MaintenanceALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. greasing of bearings. grease is already there.
2. lubrication of rollers and check conditions.its ok.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.BC 6 belt and BC 2 belt condition is not ok. we need to change it.
4. gearbox oil level check and if not then fill as per requirement.its ok.
5. check coupling and key ( if damaged than inform and change) and do the greasing. BC 2 coupling changed.
6. check the drum condition. its ok.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change.
OtherRMHS CONVEYOR
1452014 Nov 2020Breakdown MaintenanceIt's A2 clamp has leakage. We put pulp for control leakage. Now it's ok.Furnace IELECTRODE 1