Maintenance Report
Search Filter:
Showing 14,431-14,440 of 17,159 items.
| # | Date | Type | Details | Furnace | Equipment | Actions |
|---|---|---|---|---|---|---|
| 14431 | 27 Nov 2020 | Scheduled Maintenance | 1. check the water manifold line, T section, and valves. it's ok. 2. check leakage of hose pipes. no leakage. | Furnace I | WATER MAINEFOLD | |
| 14432 | 27 Nov 2020 | Scheduled Maintenance | 1. check the water manifold line, T section, and valves. it's ok. 2. check leakage of hose pipes. no leakage. | Furnace II | WATER MAINEFOLD | |
| 14433 | 27 Nov 2020 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders. It's OK. 2. check leakage of hydraulic oil. if it is then informed to HOD. IT'S ONE CYLINDER HAS SMALL AMOUNT OF LEAKAGE. | Furnace I | ELECTRODE 2 | |
| 14434 | 27 Nov 2020 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders. It's OK. 2. check leakage of hydraulic oil. if it is then informed to HOD. IT'S ONE CYLINDER HAS SMALL AMOUNT OF LEAKAGE. | Furnace I | ELECTRODE 3 | |
| 14435 | 27 Nov 2020 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders. It's OK. 2. check leakage of hydraulic oil. if it is then informed to HOD. Its ok. | Furnace I | ELECTRODE 1 | |
| 14436 | 27 Nov 2020 | Breakdown Maintenance | its belt is cut. we repair it. on Monday we need to change it. | Other | RMHS SHUTTLE CONVEYOR ( BELT CONVEYOR NO. 2) | |
| 14437 | 26 Nov 2020 | Scheduled Maintenance | its L.T. SIDE WHEEL NO. 2 bearing is damage. we park it on the tapping side because its H.T. and c.t. is working. its wheel preparation is finish. we fit it on 6014 bearing 2 nos. now its working. TAPPING SECTION E.O.T. CRANE 1 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. 2. check the gearbox oil level, leakage, and fill if required. 3. check all fasteners and mounting bolts. 4. check frame welding conditions. 5. check end traveling gears condition and do the greasing. CT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. 2. check the gearbox oil level, leakage, and fill if required. 3. check all fasteners and mounting bolts. 4. check frame welding conditions. 5. check end traveling gears condition and do the greasing. HT. 1. check rope drum, hook, rope condition. greasing of rope. 2. check the thruster drum condition and its brake tightness. 3. check all fasteners and mounting bolts. 4. check frame welding conditions. | Other | TAPPING SEC. CRANE NO. 1 | |
| 14438 | 26 Nov 2020 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 1 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing.checked and greasing is done. 2. check the gearbox oil level, leakage, and fill if required. we found leakage so we fill some amount of grease. 3. check all fasteners and mounting bolts. it is ok. 4. check frame welding conditions. it is not ok. its shaft condition is not good. we need to change it. 5. check end traveling gears condition and do the greasing. it is ok. CT. gears are ok. it is good in condition. HT. 1. check rope drum, hook, rope condition. greasing of rope. rope greasing is done. it is in good condition. 2. check the thruster drum condition and its brake tightness.no thruster. 3. check all fasteners and mounting bolts. it is ok. 4. check frame welding conditions.it is ok. | Other | CHIPPING YARD CRANE NO. 1 | |
| 14439 | 26 Nov 2020 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 2 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. greasing is done. it is ok. 2. check the gearbox oil level, leakage, and fill if required. no leakage but we fill grease. 3. check all fasteners and mounting bolts. it is ok. 4. check frame welding conditions. it is ok. 5. check end traveling gears condition and do the greasing. CT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. greasing is done. it is ok. 2. check the gearbox oil level, leakage, and fill if required. no leakage but we fill grease. 3. check all fasteners and mounting bolts. it is ok. 4. check frame welding conditions. it is ok. 5. check end traveling gears condition and do the greasing.it is ok. greasing is done. HT. 1. check rope drum, hook, rope condition. greasing of rope. greasing is done. we found that it is damage. we open and repaired. 2. check the thruster drum condition and its brake tightness. no thruster. 3. check all fasteners and mounting bolts. It is ok. 4. check frame welding conditions.it is ok. | Other | CHIPPING YARD CRANE NO. 2 | |
| 14440 | 26 Nov 2020 | Scheduled Maintenance | TELPHER FOR F1 1. checking the bearing, rollers condition, and do lubrication. ITS OK. 2. checking frames welding condition. 3. checking the cotter pin and its failure condition. | Other | TELPHER (FURNACE 1) | |