| 14281 | 16 Dec 2020 | Breakdown Maintenance | conveyor belt is damaged from 6 places.
We mount some conveyor fasteners and sone patch on conveyor.now it's ok. | Other | RMHS BELT CONVEYOR NO.1 | |
| 14282 | 16 Dec 2020 | Breakdown Maintenance | conveyor belt is damaged from 5 places.
We mount some conveyor fasteners and sone patch on conveyor.. | Other | RMHS SHUTTLE CONVEYOR ( BELT CONVEYOR NO. 2) | |
| 14283 | 16 Dec 2020 | Scheduled Maintenance | The Discharge number 2 vibration was low, so we replaced the whole set of vibrator feeder number 2 with a new one. Now the vibration is good and working. | Other | RMHS VIBRO FEEDER | |
| 14284 | 15 Dec 2020 | Scheduled Maintenance | WATER CIRCULATION PUMP 1. it is ok we greasing the motor and coupling.
FURNACE 1
GRANULATION PUMP 1,2. it is ok. we greasing coupling. but pump 1 impeller condition is not ok.
SUBMERSIBLE PUMP 1,2. it is running.
POLLUTION WATER PUMP NO 1. we change gland rope due to leakage of water. now it is ok.
FURNACE 2
GRANULATION PUMP 1,2. check coupling condition and greasing is done.
POLLUTION WATER PUMP NO 1. check it. it is ok.
OFFICE SUBMERSIBLE PUMP 1. it's running.
WASHING PLANT SUBMERSIBLE PUMP 1. it is running.
1. check the pump condition and check discharge.
2. check coupling condition, alignment, and do greasing.
3. check pipelines and valve's condition.
4. check the cooling towers' nozzles condition.
COOLING TOWER PIPELINE IS OK. AND ALL NOZZLE IS IN GOOD CONDITION. | Other | PUMP | |
| 14285 | 15 Dec 2020 | Scheduled Maintenance | F1- GRANULATION MOTOR 1,2 WATER CIRCULATION PUMP MOTOR 1,2,3, SUBMERSIBLE PUMP MOTOR 1,2, POLLUTION WATER PUMP MOTOR
NO 1
F2- GRANULATION MOTOR 1,2, POLLUTION WATER PUMP MOTOR NO 1, OFFICE SUBMERSIBLE PUMP MOTOR 1,
WASHING PLANT SUBMERSIBLE PUMP MOTOR1
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. water circulation pump motor greasing.
| Other | PUMP | |
| 14286 | 15 Dec 2020 | Scheduled Maintenance | We change its flange coupling to gear coupling. And side rubbers at down side. | Other | RMHS BELT CONVEYOR NO.4 | |
| 14287 | 14 Dec 2020 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
| Other | RMHS CONVEYOR | |
| 14288 | 14 Dec 2020 | Scheduled Maintenance | ALL VIBRATORS
check Vibro feeders coil connection, its condition and ensure its working properly with adjusting its vibrations. | Other | RMHS VIBRO FEEDER | |
| 14289 | 14 Dec 2020 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. greasing of bearings.is done.
2. lubrication of rollers and check conditions. It's done.
3. check belt status ( if damaged than inform and change) and also check tightness, speed. Bc 1 and 2 belt condition not good.
4. gearbox oil level check and if not then fill as per requirement.
5. check coupling and key ( if damaged than inform and change) and do the greasing.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change.
| Other | RMHS CONVEYOR | |
| 14290 | 14 Dec 2020 | Breakdown Maintenance | Its clamp no.B1,B2 have lekage. We fill pulp now its ok. | Furnace II | ELECTRODE 2 | |