| # | Date | Type | Details | Furnace | Equipment | Actions |
|---|---|---|---|---|---|---|
| 14271 | 16 Dec 2020 | Breakdown Maintenance | its shaft and bearing is damaged. its work is complete. but washing plant is working. pulley bush is damaged. we make an indent on it. | Other | VIBRATOR SCREEN MACHINE ( WASHING PLANT) | |
| 14272 | 16 Dec 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 1 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. check bearing condition it is ok. And greasing is done. 2. check the gearbox oil level, leakage, and fill if required. No leakage we fill some grease. 3. check all fasteners and mounting bolts.it is ok. 4. check frame welding conditions. It is ok. 5. check end traveling gears condition and do the greasing. It is ok.greasing is done. CT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. Greasing is done. 2. check the gearbox oil level, leakage, and fill if required. It has leakage but we fill some grease. 3. check all fasteners and mounting bolts. It is ok. 4. check frame welding conditions. It is ok. 5. check end traveling gears condition and do the greasing. It is ok. HT. 1. check rope drum, hook, rope condition. greasing of rope. It is ok. Greasing is done. 2. check all fasteners and mounting bolts. It is ok. 3. check frame welding conditions. It is ok. | Other | TAPPING SEC. CRANE NO. 1 | |
| 14273 | 16 Dec 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 2 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. check bearing condition it is ok. And greasing is done. 2. check the gearbox oil level, leakage, and fill if required. No leakage we fill some grease. 3. check all fasteners and mounting bolts.it is ok. 4. check frame welding conditions. It is ok. 5. check end traveling gears condition and do the greasing. It is ok.greasing is done. CT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. Greasing is done. 2. check the gearbox oil level, leakage, and fill if required. It has leakage but we fill some grease. 3. check all fasteners and mounting bolts. It is ok. 4. check frame welding conditions. It is ok. 5. check end traveling gears condition and do the greasing. It is ok. HT. 1. check rope drum, hook, rope condition. greasing of rope. It is ok. Greasing is done. 2. check all fasteners and mounting bolts. It is ok. 3. check frame welding conditions. It is ok. | Other | TAPPING SEC. CRANE NO. 2 | |
| 14274 | 16 Dec 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 3 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. Checking and greasing are done. It is ok. 2. check the gearbox oil level, leakage, and fill if required. No leakage but we fill grease. 3. check all fasteners and mounting bolts. It is OK. we fit 5 nos. bolts. 4. check frame welding conditions. It is ok.we tight all loose bolts. 5. check end traveling gears condition and do the greasing. It is ok. CT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. It is ok. 2. check the gearbox oil level, leakage, and fill if required. Leakage is there so we fill grease. 3. check all fasteners and mounting bolts. It is ok. 4. check frame welding conditions. It is ok. 5. check end traveling gears condition and do the greasing. It is ok. And greasing is done. HT. 1. check rope drum, hook, rope condition. greasing of rope. It is ok. 2. check the thruster drum condition and its brake tightness. It is ok. 3. check all fasteners and mounting bolts. It is ok. 4. check frame welding conditions. It is ok. | Other | TAPPING SEC. CRANE NO. 3 | |
| 14275 | 16 Dec 2020 | Scheduled Maintenance | 3RD FLOOR CARBON PASTE LIFTING CRANE LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. Greasing is done. 2. check the gearbox oil level, leakage, and fill if required. It is OK. 3. check all fasteners and mounting bolts.it is ok. 4. check frame welding conditions.it is ok. 5. check end traveling gears condition and do the greasing. It is ok. CT. It is ok. Gear bearing is ok. HT. It's is ok. Pulley condition is ok | Other | CARBON PASTE LIFTING CRANE | |
| 14276 | 16 Dec 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 1 LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. | Other | TAPPING SEC. CRANE NO. 1 | |
| 14277 | 16 Dec 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 2 LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. | Other | TAPPING SEC. CRANE NO. 2 | |
| 14278 | 16 Dec 2020 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 3 LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. | Other | TAPPING SEC. CRANE NO. 3 | |
| 14279 | 16 Dec 2020 | Scheduled Maintenance | 3RD FLOOR CARBON PASTE LIFTING CRANE LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. | Other | CARBON PASTE LIFTING CRANE | |
| 14280 | 16 Dec 2020 | Breakdown Shutdown | Its electrode 1 has sparking problem. After that clamp no. A4 HAS start leakage. We change it. No it's ok. | Furnace II | ELECTRODE 1 | |