Maintenance Report

Search Filter:

Showing 13,881-13,890 of 17,159 items.

#DateTypeDetailsFurnaceEquipmentActions
1388101 Feb 2021OtherWe are making one foundation frame for the vibrator machine which will use for washing slag.
its testing is done. We are adding some additional features on it.
It's is ready. Fabrication work is complete. Testing successfully.
OtherVIBRATOR SCREEN MACHINE
1388230 Jan 2021Scheduled MaintenanceWashing is breakdown.
TILTING HOPPER
1. greasing all bushes.
2.hydraulic pump and motor coupling.
3. checking the hydraulic oil level and if not then fill.
4. check hopper welding sections.

CONVEYOR NO 1
1. greasing of bearings.
2. lubrication of rollers and check conditions.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.
4. gearbox oil level check and if not then fill as per requirement.
5. check coupling and key ( if damaged than inform and change) and do the greasing.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change.

CRUSHER
1. check the crusher foundation.
2. check V belts condition.
3. do greasing.
4. check spring rod condition and gap between plates.

VIBRATOR
1. check the spring condition.
2. check V belts condition.
3. check vibrations if not good then adjust.
4. check the frame welding condition.

ROLLER
1. check roller speed.
2.greasing of bearings.
3.gearbox oil level check and if not then fill as per requirement.
4. check coupling and key ( if damaged than inform and change) and do the greasing.
5. check the drum condition.
6. check the mounting frame welding condition.

DISCHARGE CONVEYOR
1. greasing of bearings.
2. lubrication of rollers and check conditions.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.
4. gearbox oil level check and if not then fill as per requirement.
5. check coupling and key ( if damaged than inform and change) and do the greasing.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change.
OtherWASHING PLANT
1388330 Jan 2021Scheduled MaintenanceWASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP(Replacement done)

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
5. check the high mast lights also.
OtherWASHING PLANT
1388430 Jan 2021Breakdown MaintenanceIt's motor foundation is broken. Because of the chipping yard guys not use properly they using it to pull the metal trolly from tapping section.
We repair it using cast-iron welding rod.now it's ok.
OtherCHIPPING YARD CRANE NO. 1
1388529 Jan 2021Scheduled MaintenanceF1- ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.

Furnace IELECTRODE 1
1388629 Jan 2021Scheduled MaintenanceF1- ELECTRODE BLOWER 2

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
Furnace IELECTRODE 2
1388729 Jan 2021Scheduled MaintenanceF1- ELECTRODE BLOWER 3

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.

Furnace IELECTRODE 3
1388829 Jan 2021Scheduled MaintenanceFURNACE 1

1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.

Furnace IHYDRAULIC POWER PACK NO. 1
1388929 Jan 2021Scheduled MaintenanceFURNACE 1

1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
Furnace IHYDRAULIC POWER PACK NO. 2
1389029 Jan 2021Scheduled Maintenance ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
Furnace IIELECTRODE 1