| 13811 | 10 Feb 2021 | Breakdown Maintenance | Its Convenor belt is damage. We changing it with new one. New convenor details 650mm width length 145 mtr | Other | RMHS BELT CONVEYOR NO.1 | |
| 13812 | 10 Feb 2021 | Breakdown Shutdown | It's electrode 3 has sparking problem. We open all bolts and filling paste and claypaste. Now it's ok. | Furnace I | ELECTRODE 3 | |
| 13813 | 10 Feb 2021 | Breakdown Shutdown | It's electorde 3 has not slipping. We open clamp bolts and doing slipping. Now it's ok. | Furnace I | ELECTRODE 3 | |
| 13814 | 09 Feb 2021 | Scheduled Maintenance | It's ok.
WATER CIRCULATION PUMP 1,2,3,
FURNACE 1
GRANULATION PUMP 1,2
SUBMERSIBLE PUMP 1,2,
POLLUTION WATER PUMP NO 1
FURNACE 2
GRANULATION PUMP 1,2,
POLLUTION WATER PUMP NO 1,
OFFICE SUBMERSIBLE PUMP 1,
WASHING PLANT SUBMERSIBLE PUMP 1
1. check the pump condition and check discharge.
2. check coupling condition, alignment, and do greasing.
3. check pipelines and valve's condition.
4. check cooling towers nozzles condition.
| Other | PUMP | |
| 13815 | 09 Feb 2021 | Scheduled Maintenance | F1- GRANULATION MOTOR 1,2 WATER CIRCULATION PUMP MOTOR 1,2,3, SUBMERSIBLE PUMP MOTOR 1,2, POLLUTION WATER PUMP MOTOR
NO 1
F2- GRANULATION MOTOR 1,2, POLLUTION WATER PUMP MOTOR NO 1, OFFICE SUBMERSIBLE PUMP MOTOR 1(water is contaminated),
WASHING PLANT SUBMERSIBLE PUMP MOTOR1.(new pump installed and working )
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. water circulation pump motor greasing.
| Other | PUMP | |
| 13816 | 09 Feb 2021 | Breakdown Maintenance | Its motor change foundation bolta are damage. We open gear box and cutting it. Now is working. | Other | TAPPING SEC. CRANE NO. 3 | |
| 13817 | 09 Feb 2021 | Breakdown Maintenance | Furnace no. 1
Pollution id fan is not good. We are removing one id fan from Furnace no. 2 side and fitting furnace no. 1 side. This work is done. Now we are ready for testing. | Other | POLLUTION 2, ID FAN NO. 2 | |
| 13818 | 08 Feb 2021 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
| Other | RMHS CONVEYOR | |
| 13819 | 08 Feb 2021 | Scheduled Maintenance | ALL VIBRATORS
check Vibro feeders coil connection, its condition and ensure its working properly with adjusting its vibrations. | Other | RMHS VIBRO FEEDER | |
| 13820 | 08 Feb 2021 | Scheduled Maintenance |
Greasing done.
ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. greasing of bearings.
2. lubrication of rollers and check conditions.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.
4. gearbox oil level check and if not then fill as per requirement.
5. check coupling and key ( if damaged than inform and change) and do the greasing.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change.
| Other | RMHS CONVEYOR | |