| 13781 | 12 Feb 2021 | Scheduled Maintenance | 1. checking loose parts and check the hydraulic oil level in the tank.
2. check solenoid valve working conditions and adjust oil pressure.
3. check hydraulic line leakage. | Furnace II | HYDRAULIC POWER PACK NO. 2 | |
| 13782 | 12 Feb 2021 | Scheduled Maintenance | 1. check the water manifold line, T section, and valves.
2. check leakage of hose pipes. | Furnace I | WATER MAINEFOLD | |
| 13783 | 12 Feb 2021 | Scheduled Maintenance | 1. check the water manifold line, T section, and valves.
2. check leakage of hose pipes. | Furnace II | WATER MAINEFOLD | |
| 13784 | 12 Feb 2021 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD. | Furnace I | ELECTRODE 2 | |
| 13785 | 12 Feb 2021 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD. | Furnace I | ELECTRODE 3 | |
| 13786 | 12 Feb 2021 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD. | Furnace I | ELECTRODE 1 | |
| 13787 | 12 Feb 2021 | Breakdown Shutdown | It's upper and lower clamping cylinder of electrode 1 has leakage. We changing down cylinder with spare one. We open top cylinder and repaired it than mount it. After that we found that electrode side some tie rods are damaged.its details are below.
1. Electrode 1
Clamp no. A3,A4 tie rod changed.
2. Electrode 2
Clamp no. B6 Tie rod changed.
3. Electrode 3
Clamp no. C2, C3 tie rod change.
After that we found that electrode 3 pressure ring Eye connector is damaged and it's bolt also damaged. We remove it by welding and fitting new one. We also filling paste and clay paste and tight pressure ring bolts at respective clamp which I am mention.
We found that it's B6 clamp water hose pipe has leakage. We changing it's jublee clamps. Now it's ok. | Furnace I | FURNACE 1 | |
| 13788 | 12 Feb 2021 | Breakdown Shutdown | It's slipping is not done. We open bolts and do it. Now it's ok. | Other | ELECTRODE 2 | |
| 13789 | 11 Feb 2021 | Scheduled Maintenance | Greasing done.
CHIPPING YARD E.O.T. CRANE 1
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.
CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.
HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
| Other | CHIPPING YARD CRANE NO. 1 | |
| 13790 | 11 Feb 2021 | Scheduled Maintenance | It's still in breakdown.
CHIPPING YARD E.O.T. CRANE 2
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.
CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.
HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
| Other | CHIPPING YARD CRANE NO. 2 | |