1356112 Mar 2021Breakdown ShutdownElectrode 3 sparking. We putting clay with paste to electrode 1 and 3 side. Furnace IELECTRODE 3
1356212 Mar 2021Breakdown ShutdownElectrode 3 sparking. We tighting bolts. Now it's ok. It's clamp c6 has water leakage. We putting pulp.Furnace IELECTRODE 3
1356312 Mar 2021Breakdown ShutdownElectrode 3 sparking we fighting bolts. It's c6 clamp also leakage. We putting pulp.Furnace IELECTRODE 3
1356412 Mar 2021Breakdown ShutdownIt's clamp no. C3 bolts coming out. We switch off furnace and fitting new bolt. Now it's ok.Furnace IELECTRODE 3
1356512 Mar 2021Breakdown MaintenanceCrane not working. When we check found that it's motor flange to body allen key bolts are damaged. We open motor and bring it to workshop. After that we found that it's inside bearing 6208 is damaged. We replace bearing with allen key bolts and fitting it. Now it's ok.OtherTAPPING SEC. CRANE NO. 1
1356611 Mar 2021Scheduled Maintenance
Breakdown due to break liner. Finish.
CHIPPING YARD E.O.T. CRANE 1
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.

OtherCHIPPING YARD CRANE NO. 1
1356711 Mar 2021Scheduled MaintenanceCHIPPING YARD E.O.T. CRANE 2

LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.

OtherCHIPPING YARD CRANE NO. 2
1356811 Mar 2021Scheduled MaintenanceTELPHER FOR F1
1. checking the bearing, rollers condition, and do lubrication.
2. checking frames welding condition.
3. checking cotter pin and its failure condition.

OtherTELPHER (FURNACE 1)
1356911 Mar 2021Scheduled MaintenanceTELPHER FOR F2

1. checking the bearing, rollers condition and do lubrication.
2. checking frames welding condition.
3. checking cotter pin and its failure condition.

OtherTELPHER ( FURNACE 2)
1357011 Mar 2021Scheduled MaintenancePOLLUTION ID FANS (Furnace 1)
1. open cover and clean dust.
2. check the balancing of impeller and vibration isolation.
3. check v belts condition and inform if its on critical stage.
4. check foundation bolts and nuts of Plummer blocks.
5. greasing the Plummer blocks.
6. check the duct condition and remove dust from the duct.
7. check stack condition and check its temperature.
OtherPOLLUTION 1