#DateTypeDetailsFurnaceEquipmentActions
1346124 Mar 2021Scheduled Maintenance3RD FLOOR CARBON PASTE LIFTING CRANE

LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
OtherCARBON PASTE LIFTING CRANE
1346224 Mar 2021Scheduled MaintenanceTAPPING SECTION E.O.T. CRANE 1

LT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

CT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

HT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
OtherTAPPING SEC. CRANE NO. 1
1346324 Mar 2021Scheduled MaintenanceTAPPING SECTION E.O.T. CRANE 2

LT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

CT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

HT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
OtherTAPPING SEC. CRANE NO. 2
1346424 Mar 2021Scheduled MaintenanceTAPPING SECTION E.O.T. CRANE 3

LT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

CT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

HT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
OtherTAPPING SEC. CRANE NO. 3
1346524 Mar 2021Scheduled Maintenance3RD FLOOR CARBON PASTE LIFTING CRANE

LT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

CT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

HT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
OtherCARBON PASTE LIFTING CRANE
1346624 Mar 2021Breakdown ShutdownIt's new clamp no. C2 is punchers after heavy sparking. So we change it with new one. Now it's ok.Furnace IIELECTRODE 3
1346723 Mar 2021Breakdown MaintenanceIt's electrode 1 all clamp has leakage so many times. We filling pulp. Now it's ok.Furnace IELECTRODE 1
1346823 Mar 2021Breakdown MaintenanceIt's load reduced. Due to mantle cooling blower of electrode 1 is not working. So we replace it with new one. Now it's ok.Furnace IIELECTRODE 1
1346923 Mar 2021Scheduled MaintenanceWATER CIRCULATION PUMP 1,2,3,
FURNACE 1
GRANULATION PUMP 1,2
SUBMERSIBLE PUMP 1,2,
POLLUTION WATER PUMP NO 1

FURNACE 2
GRANULATION PUMP 1,2,
POLLUTION WATER PUMP NO 1,
OFFICE SUBMERSIBLE PUMP 1,
WASHING PLANT SUBMERSIBLE PUMP 1

1. check the pump condition and check discharge.
2. check coupling condition, alignment, and do greasing.
3. check pipelines and valve's condition.
4. check cooling towers nozzles condition.
OtherPUMP
1347023 Mar 2021Scheduled MaintenanceF1- GRANULATION MOTOR 1,2 WATER CIRCULATION PUMP MOTOR 1,2,3, SUBMERSIBLE PUMP MOTOR 1,2, POLLUTION WATER PUMP MOTOR
NO 1

F2- GRANULATION MOTOR 1,2, POLLUTION WATER PUMP MOTOR NO 1, OFFICE SUBMERSIBLE PUMP MOTOR 1,
WASHING PLANT SUBMERSIBLE PUMP MOTOR1

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. water circulation pump motor greasing.
OtherPUMP