| 13421 | 26 Mar 2021 | Breakdown Maintenance | It's motor is burn. After that new motor fitting with new gear coupling. Motor specification 10hp 900 rpm.
Gear coupling 103
Also it's pipe line welding work is done. Now it's connected with all of the electrodes of f2. | Furnace II | Electrode cooling blower F2 (spare) | |
| 13422 | 26 Mar 2021 | Breakdown Shutdown | It's electrode 1 and 2 have sparking. Clamp no. B2 and B1. We switch off furnace to tight pressure bolts. Now it's ok. | Furnace II | ELECTRODE 2 | |
| 13423 | 26 Mar 2021 | Breakdown Maintenance | It's conveyor belt joint is coming out. So we use conveyor solution to rejoin it. Now it's ok. | Other | RMHS BELT CONVEYOR NO.6 | |
| 13424 | 26 Mar 2021 | Scheduled Maintenance | F1- ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace I | ELECTRODE 1 | |
| 13425 | 26 Mar 2021 | Scheduled Maintenance | F1- ELECTRODE BLOWER 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace I | ELECTRODE 2 | |
| 13426 | 26 Mar 2021 | Scheduled Maintenance | F1- ELECTRODE BLOWER 3
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace I | ELECTRODE 3 | |
| 13427 | 26 Mar 2021 | Scheduled Maintenance | FURNACE 1
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
| Furnace I | HYDRAULIC POWER PACK NO. 1 | |
| 13428 | 26 Mar 2021 | Scheduled Maintenance | FURNACE 1
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
| Furnace I | HYDRAULIC POWER PACK NO. 2 | |
| 13429 | 26 Mar 2021 | Scheduled Maintenance | ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace II | ELECTRODE 1 | |
| 13430 | 26 Mar 2021 | Scheduled Maintenance | ELECTRODE BLOWER 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 2 | |