#DateTypeDetailsFurnaceEquipmentActions
1208130 Sep 2021Scheduled MaintenancePOLLUTION ID FANS (Furnace 1)
1. open cover and clean dust.
2. check the balancing of impeller and vibration isolation.
3. check v belts condition and inform if its on critical stage.
4. check foundation bolts and nuts of Plummer blocks.
5. greasing the Plummer blocks.
6. check the duct condition and remove dust from the duct.
7. check stack condition and check its temperature.
OtherPOLLUTION 1
1208230 Sep 2021Scheduled MaintenancePOLLUTION ID FANS FOR (Furnace 2)
1. open cover and clean dust.
2. check the balancing of impeller and vibration isolation.
3. check v belts condition and inform if its on critical stage.
4. check foundation bolts and nuts of Plummer blocks.
5. greasing the Plummer blocks.
6. check the duct condition and remove dust from the duct.
7. check stack condition and check its temperature.
OtherPOLLUTION 2
1208330 Sep 2021Scheduled MaintenanceCHIPPING YARD E.O.T. CRANE 1

LT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

CT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

HT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
OtherCHIPPING YARD CRANE NO. 1
1208430 Sep 2021Scheduled MaintenanceCHIPPING YARD E.O.T. CRANE 2

LT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

CT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

HT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
OtherCHIPPING YARD CRANE NO. 2
1208530 Sep 2021Scheduled MaintenanceTELPHER FOR F1
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
OtherTELPHER (FURNACE 1)
1208630 Sep 2021Scheduled MaintenanceTELPHER FOR F2
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
OtherTELPHER ( FURNACE 2)
1208730 Sep 2021Scheduled MaintenancePOLLUTION ID FANS FOR F1
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. MOTOR GREASING.
OtherPOLLUTION 1
1208830 Sep 2021Scheduled MaintenancePOLLUTION ID FANS FOR F2
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. MOTOR GREASING.
OtherPOLLUTION 2
1208930 Sep 2021Scheduled ShutdownProtection shield full welding is done.
Electrode 2
B5 MAINTEL LOWER side full bus tube open and leakage arrest.
Than it's B5 content clamp changed.
Bus tube side upper and lower full breaking with contact clmap breazzing is done.
It's Pressure ring lifting with 1nos fork changed with full welding.
2nd floor
Seal box electrode 3
Air pipe line changed.
Furnace IIFURNACE 2
1209030 Sep 2021Scheduled ShutdownFurnace II 9 MVA Auto transformer OLTC Maintenance done and oil is replaced (310liters). Tap counter-017756 Furnace IIOTHERS