| 12081 | 30 Sep 2021 | Scheduled Maintenance | POLLUTION ID FANS (Furnace 1) 1. open cover and clean dust. 2. check the balancing of impeller and vibration isolation. 3. check v belts condition and inform if its on critical stage. 4. check foundation bolts and nuts of Plummer blocks. 5. greasing the Plummer blocks. 6. check the duct condition and remove dust from the duct. 7. check stack condition and check its temperature. | Other | POLLUTION 1 | |
| 12082 | 30 Sep 2021 | Scheduled Maintenance | POLLUTION ID FANS FOR (Furnace 2) 1. open cover and clean dust. 2. check the balancing of impeller and vibration isolation. 3. check v belts condition and inform if its on critical stage. 4. check foundation bolts and nuts of Plummer blocks. 5. greasing the Plummer blocks. 6. check the duct condition and remove dust from the duct. 7. check stack condition and check its temperature. | Other | POLLUTION 2 | |
| 12083 | 30 Sep 2021 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 1 LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. | Other | CHIPPING YARD CRANE NO. 1 | |
| 12084 | 30 Sep 2021 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 2 LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. | Other | CHIPPING YARD CRANE NO. 2 | |
| 12085 | 30 Sep 2021 | Scheduled Maintenance | TELPHER FOR F1 1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. | Other | TELPHER (FURNACE 1) | |
| 12086 | 30 Sep 2021 | Scheduled Maintenance | TELPHER FOR F2 1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. | Other | TELPHER ( FURNACE 2) | |
| 12087 | 30 Sep 2021 | Scheduled Maintenance | POLLUTION ID FANS FOR F1 1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. MOTOR GREASING. | Other | POLLUTION 1 | |
| 12088 | 30 Sep 2021 | Scheduled Maintenance | POLLUTION ID FANS FOR F2 1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. MOTOR GREASING. | Other | POLLUTION 2 | |
| 12089 | 30 Sep 2021 | Scheduled Shutdown | Protection shield full welding is done. Electrode 2 B5 MAINTEL LOWER side full bus tube open and leakage arrest. Than it's B5 content clamp changed. Bus tube side upper and lower full breaking with contact clmap breazzing is done. It's Pressure ring lifting with 1nos fork changed with full welding. 2nd floor Seal box electrode 3 Air pipe line changed. | Furnace II | FURNACE 2 | |
| 12090 | 30 Sep 2021 | Scheduled Shutdown | Furnace II 9 MVA Auto transformer OLTC Maintenance done and oil is replaced (310liters). Tap counter-017756 | Furnace II | OTHERS | |