| 12071 | 01 Oct 2021 | Scheduled Maintenance | 1. check the water manifold line, T section, and valves.
2. check leakage of hose pipes. | Furnace II | WATER MAINEFOLD | |
| 12072 | 01 Oct 2021 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD. | Furnace I | ELECTRODE 2 | |
| 12073 | 01 Oct 2021 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD. | Furnace I | ELECTRODE 3 | |
| 12074 | 01 Oct 2021 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD. | Furnace I | ELECTRODE 1 | |
| 12075 | 01 Oct 2021 | Scheduled Shutdown | Electrode 1
Preassure ring lifting with 3 nos fork change with full welding. Pressure ring joint bolt fitting is done.
Sealbox rope change.
Eletrode 2
Pressure ring lifting with 2nos fork change with full welding.
Seal box rope change.
Electrode 3
Pressure ring liftingbwith 2 nos fork changed. With full welding.sealbox rope change
Hood hose pipe changed.
One hose pipe 2and 1/2 inch 3mtr changed
Water mainefold side dummy with tee changed.with full welding. | Furnace I | FURNACE 1 | |
| 12076 | 01 Oct 2021 | Scheduled Shutdown | furnace I Transformer OLTC maintenance done and Oil is replaced (210liters).
Tap counter-034364 | Furnace I | OTHERS | |
| 12077 | 30 Sep 2021 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 1
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.
CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.
HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
| Other | CHIPPING YARD CRANE NO. 1 | |
| 12078 | 30 Sep 2021 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 2
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.
CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.
HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
| Other | CHIPPING YARD CRANE NO. 2 | |
| 12079 | 30 Sep 2021 | Scheduled Maintenance | TELPHER FOR F1
1. checking the bearing, rollers condition, and do lubrication.
2. checking frames welding condition.
3. checking cotter pin and its failure condition.
| Other | TELPHER (FURNACE 1) | |
| 12080 | 30 Sep 2021 | Scheduled Maintenance | TELPHER FOR F2
1. checking the bearing, rollers condition and do lubrication.
2. checking frames welding condition.
3. checking cotter pin and its failure condition.
| Other | TELPHER ( FURNACE 2) | |