1196115 Oct 2021Scheduled Maintenance1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD.
Furnace IELECTRODE 1
1196215 Oct 2021Breakdown MaintenancePollution main pump
It's bearing is damaged because not filling grease inside. We are open it fully and waiting for bearing coming from lusaka.bearing number is 6307. bearing fitting is done. now its running.
Furnace IIPOLLUTION 2
1196315 Oct 2021Breakdown MaintenanceWashing plant discharge conveyor
It's belt is damaged. We fix fasteners. Now it's OK.
OtherCONVEYOR 2 ( WASHING PLANT)
1196415 Oct 2021Breakdown MaintenanceIt's conveyor belt replace with new one. Now it's ok.Other RMHS SHUTTLE CONVEYOR ( BELT CONVEYOR NO. 2)
1196514 Oct 2021Scheduled MaintenanceCHIPPING YARD E.O.T. CRANE 1
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.

OtherCHIPPING YARD CRANE NO. 1
1196614 Oct 2021Scheduled MaintenanceCHIPPING YARD E.O.T. CRANE 2

LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.

HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.

OtherCHIPPING YARD CRANE NO. 2
1196714 Oct 2021Scheduled MaintenanceTELPHER FOR F1
1. checking the bearing, rollers condition, and do lubrication.
2. checking frames welding condition.
3. checking cotter pin and its failure condition.

OtherTELPHER (FURNACE 1)
1196814 Oct 2021Scheduled MaintenanceTELPHER FOR F2

1. checking the bearing, rollers condition and do lubrication.
2. checking frames welding condition.
3. checking cotter pin and its failure condition.

OtherTELPHER ( FURNACE 2)
1196914 Oct 2021Scheduled MaintenancePOLLUTION ID FANS (Furnace 1)
1. open cover and clean dust.
2. check the balancing of impeller and vibration isolation.
3. check v belts condition and inform if its on critical stage.
4. check foundation bolts and nuts of Plummer blocks.
5. greasing the Plummer blocks.
6. check the duct condition and remove dust from the duct.
7. check stack condition and check its temperature.
OtherPOLLUTION 1
1197014 Oct 2021Scheduled MaintenancePOLLUTION ID FANS FOR (Furnace 2)
1. open cover and clean dust.
2. check the balancing of impeller and vibration isolation.
3. check v belts condition and inform if its on critical stage.
4. check foundation bolts and nuts of Plummer blocks.
5. greasing the Plummer blocks.
6. check the duct condition and remove dust from the duct.
7. check stack condition and check its temperature.
OtherPOLLUTION 2