Maintenance Report

Search Filter:

Showing 11,871-11,880 of 17,159 items.

#DateTypeDetailsFurnaceEquipmentActions
1187124 Oct 2021Breakdown Shutdownits electrode 3 is broken. we remove it by chain block and start the furnace.Furnace IIELECTRODE 3
1187224 Oct 2021Breakdown Shutdownits electrode 1 is broken. we remove it by chain broken. now it ok.Furnace IIELECTRODE 1
1187324 Oct 2021Breakdown MaintenanceITS BELT fasteners coming out. REPAIRING Is done.Other RMHS BELT CONVEYOR NO.6
1187423 Oct 2021Breakdown MaintenanceIt's crusher plate is finish. We remove it to fill welding on plate. Welding ois finish. we fit it. mow its ok.Othercock crusher
1187523 Oct 2021Scheduled MaintenanceTILTING HOPPER
1. greasing all bushes.
2.hydraulic pump and motor coupling.
3. checking the hydraulic oil level and if not then fill.
4. check hopper welding sections.

CONVEYOR NO 1
1. greasing of bearings.
2. lubrication of rollers and check conditions.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.
4. gearbox oil level check and if not then fill as per requirement.
5. check coupling and key ( if damaged than inform and change) and do the greasing.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change.

CRUSHER
1. check the crusher foundation.
2. check V belts condition.
3. do greasing.
4. check spring rod condition and gap between plates.

VIBRATOR
1. check the spring condition.
2. check V belts condition.
3. check vibrations if not good then adjust.
4. check the frame welding condition.

ROLLER
1. check roller speed.
2.greasing of bearings.
3.gearbox oil level check and if not then fill as per requirement.
4. check coupling and key ( if damaged than inform and change) and do the greasing.
5. check the drum condition.
6. check the mounting frame welding condition.

DISCHARGE CONVEYOR
1. greasing of bearings.
2. lubrication of rollers and check conditions.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.
4. gearbox oil level check and if not then fill as per requirement.
5. check coupling and key ( if damaged than inform and change) and do the greasing.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change.
OtherWASHING PLANT
1187623 Oct 2021Scheduled MaintenanceWASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
5. check the high mast lights also.
OtherWASHING PLANT
1187723 Oct 2021Breakdown Shutdownits electrode 3 side hood have heavy water leakage. we welded it also we put clay and paste to c3,c4,c5,c6 clamps.Furnace IIELECTRODE 3
1187823 Oct 2021Breakdown MaintenanceITS BELT fasteners coming out.REPAIRING Is done.Other RMHS BELT CONVEYOR NO.6
1187923 Oct 2021Breakdown MaintenanceITS BELT fasteners coming out.REPAIRING Is done.Other RMHS BELT CONVEYOR NO.6
1188023 Oct 2021Breakdown MaintenanceITS BELT fasteners coming out.REPAIRING Is done.Other RMHS BELT CONVEYOR NO.6