Maintenance Report
Search Filter:
Showing 11,851-11,860 of 17,159 items.
| # | Date | Type | Details | Furnace | Equipment | Actions |
|---|---|---|---|---|---|---|
| 11851 | 27 Oct 2021 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 1 LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. | Other | TAPPING SEC. CRANE NO. 1 | |
| 11852 | 27 Oct 2021 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 2 LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. | Other | TAPPING SEC. CRANE NO. 2 | |
| 11853 | 27 Oct 2021 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 3 LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. | Other | TAPPING SEC. CRANE NO. 3 | |
| 11854 | 27 Oct 2021 | Scheduled Maintenance | 3RD FLOOR CARBON PASTE LIFTING CRANE LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. | Other | CARBON PASTE LIFTING CRANE | |
| 11855 | 27 Oct 2021 | Scheduled Shutdown | The Relay testing of 66kv pannel, 11kv outgoing pannel of 66kv substation is done. The Relay testing 0f 11kv Incomer,Furnace 1, Furnace 2, Aux.TR and capacitor bank pannels of 11kv substation is done | Other | OTHERS | |
| 11856 | 27 Oct 2021 | Scheduled Shutdown | somkehood water two hosepipe changed. Electrode 2 Contact clamp one hosepipe changed. Smokehood welding. Hydrolic oil line checking. | Furnace I | OTHERS | |
| 11857 | 27 Oct 2021 | Scheduled Shutdown | Electrode 3 contact clamp changed. Electrode 2 Slipping cylinder changed. Electrode 3 Sealbox rope changed. Hydrolic line oil leakage arrested. Insulation checking . | Furnace II | OTHERS | |
| 11858 | 27 Oct 2021 | Breakdown Maintenance | its front boom plate is damaged. we replace it with new one. | Other | fork lift | |
| 11859 | 26 Oct 2021 | Scheduled Maintenance | WATER CIRCULATION PUMP 1,2,3, FURNACE 1 GRANULATION PUMP 1,2 SUBMERSIBLE PUMP 1,2, POLLUTION WATER PUMP NO 1 FURNACE 2 GRANULATION PUMP 1,2, POLLUTION WATER PUMP NO 1, OFFICE SUBMERSIBLE PUMP 1, WASHING PLANT SUBMERSIBLE PUMP 1 1. check the pump condition and check discharge. 2. check coupling condition, alignment, and do greasing. 3. check pipelines and valve's condition. 4. check cooling towers nozzles condition. | Other | PUMP | |
| 11860 | 26 Oct 2021 | Scheduled Maintenance | F1- GRANULATION MOTOR 1,2 WATER CIRCULATION PUMP MOTOR 1,2,3, SUBMERSIBLE PUMP MOTOR 1,2, POLLUTION WATER PUMP MOTOR NO 1 F2- GRANULATION MOTOR 1,2, POLLUTION WATER PUMP MOTOR NO 1, OFFICE SUBMERSIBLE PUMP MOTOR 1, WASHING PLANT SUBMERSIBLE PUMP MOTOR1 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. water circulation pump motor greasing. | Other | PUMP | |