| 11801 | 01 Nov 2021 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
| Other | RMHS CONVEYOR | |
| 11802 | 01 Nov 2021 | Scheduled Maintenance | ALL VIBRATORS
check Vibro feeders coil connection, its condition and ensure its working properly with adjusting its vibrations. | Other | RMHS VIBRO FEEDER | |
| 11803 | 01 Nov 2021 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. greasing of bearings.
2. lubrication of rollers and check conditions.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.
4. gearbox oil level check and if not then fill as per requirement.
5. check coupling and key ( if damaged than inform and change) and do the greasing.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change.
| Other | RMHS CONVEYOR | |
| 11804 | 01 Nov 2021 | Breakdown Maintenance | its wheel guided pin is damaged. we repaired it and make new one at lathe. now its ok. | Other | sanny escavator | |
| 11805 | 01 Nov 2021 | Breakdown Maintenance | its bucket pin is damaged. we making it on lathe. its work is in progress. we fit another spare on .sanny is working now . | Other | sanny escavator | |
| 11806 | 01 Nov 2021 | Breakdown Maintenance | some nozzles are damaged. we fix new one, now its ok. | Other | COOLING TOWER | |
| 11807 | 01 Nov 2021 | Breakdown Maintenance | its back support pedestal bearing is damaged. we replace with spare one, now tis ok. | Other | CHIPPING YARD CRANE NO. 1 | |
| 11808 | 01 Nov 2021 | Breakdown Shutdown | ITS hood pipe line hose pipe damaged. we cuit and fit it again. now its ok. | Furnace II | FURNACE 2 | |
| 11809 | 30 Oct 2021 | Scheduled Maintenance | TILTING HOPPER
1. greasing all bushes.
2.hydraulic pump and motor coupling.
3. checking the hydraulic oil level and if not then fill.
4. check hopper welding sections.
CONVEYOR NO 1
1. greasing of bearings.
2. lubrication of rollers and check conditions.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.
4. gearbox oil level check and if not then fill as per requirement.
5. check coupling and key ( if damaged than inform and change) and do the greasing.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change.
CRUSHER
1. check the crusher foundation.
2. check V belts condition.
3. do greasing.
4. check spring rod condition and gap between plates.
VIBRATOR
1. check the spring condition.
2. check V belts condition.
3. check vibrations if not good then adjust.
4. check the frame welding condition.
ROLLER
1. check roller speed.
2.greasing of bearings.
3.gearbox oil level check and if not then fill as per requirement.
4. check coupling and key ( if damaged than inform and change) and do the greasing.
5. check the drum condition.
6. check the mounting frame welding condition.
DISCHARGE CONVEYOR
1. greasing of bearings.
2. lubrication of rollers and check conditions.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.
4. gearbox oil level check and if not then fill as per requirement.
5. check coupling and key ( if damaged than inform and change) and do the greasing.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change. | Other | WASHING PLANT | |
| 11810 | 30 Oct 2021 | Scheduled Maintenance | WASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
5. check the high mast lights also. | Other | WASHING PLANT | |