#DateTypeDetailsFurnaceEquipmentActions
1169113 Nov 2021Scheduled MaintenanceWASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
5. check the high mast lights also.
OtherWASHING PLANT
1169212 Nov 2021Otherpollution id fan removing and shifting down side work is in progress. its connection from pipe line duct dummy is done. dismantling work is start. we successfully remove and shift it down side. now its pipe line bend and foundation work will be start.OtherPOLLUTION 1
1169312 Nov 2021Breakdown Maintenanceits pipe line is damaged we fitting one new pipe line. it work is in progress.
1 side pipe line is replaced with new one. today we are completing other side one.
Furnace IIFURNACE 2 TRANSFORMER NO. 1 ( GROUND FLOOR)
1169412 Nov 2021Scheduled MaintenanceF1- ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.

Furnace IELECTRODE 1
1169512 Nov 2021Scheduled MaintenanceF1- ELECTRODE BLOWER 2

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
Furnace IELECTRODE 2
1169612 Nov 2021Scheduled MaintenanceF1- ELECTRODE BLOWER 3

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.

Furnace IELECTRODE 3
1169712 Nov 2021Scheduled MaintenanceFURNACE 1

1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.

Furnace IHYDRAULIC POWER PACK NO. 1
1169812 Nov 2021Scheduled MaintenanceFURNACE 1

1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
Furnace IHYDRAULIC POWER PACK NO. 2
1169912 Nov 2021Scheduled Maintenance ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
Furnace IIELECTRODE 1
1170012 Nov 2021Scheduled MaintenanceELECTRODE BLOWER 2

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
Furnace IIELECTRODE 2