Maintenance Report
Search Filter:
Showing 11,671-11,680 of 17,159 items.
| # | Date | Type | Details | Furnace | Equipment | Actions |
|---|---|---|---|---|---|---|
| 11671 | 17 Nov 2021 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 2 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. 2. check the gearbox oil level, leakage, and fill if required. 3. check all fasteners and mounting bolts. 4. check frame welding conditions. 5. check end traveling gears condition and do the greasing. CT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. 2. check the gearbox oil level, leakage, and fill if required. 3. check all fasteners and mounting bolts. 4. check frame welding conditions. 5. check end traveling gears condition and do the greasing. HT. 1. check rope drum, hook, rope condition. greasing of rope. 2. check the thruster drum condition and its brake tightness. 3. check all fasteners and mounting bolts. 4. check frame welding conditions. | Other | TAPPING SEC. CRANE NO. 2 | |
| 11672 | 17 Nov 2021 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 3 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. 2. check the gearbox oil level, leakage, and fill if required. 3. check all fasteners and mounting bolts. 4. check frame welding conditions. 5. check end traveling gears condition and do the greasing. CT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. 2. check the gearbox oil level, leakage, and fill if required. 3. check all fasteners and mounting bolts. 4. check frame welding conditions. 5. check end traveling gears condition and do the greasing. HT. 1. check rope drum, hook, rope condition. greasing of rope. 2. check the thruster drum condition and its brake tightness. 3. check all fasteners and mounting bolts. 4. check frame welding conditions. | Other | TAPPING SEC. CRANE NO. 3 | |
| 11673 | 17 Nov 2021 | Scheduled Maintenance | 3RD FLOOR CARBON PASTE LIFTING CRANE LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. 2. check the gearbox oil level, leakage, and fill if required. 3. check all fasteners and mounting bolts. 4. check frame welding conditions. 5. check end traveling gears condition and do the greasing. CT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. 2. check the gearbox oil level, leakage, and fill if required. 3. check all fasteners and mounting bolts. 4. check frame welding conditions. 5. check end traveling gears condition and do the greasing. HT. 1. check rope drum, hook, rope condition. greasing of rope. 2. check the thruster drum condition and its brake tightness. 3. check all fasteners and mounting bolts. 4. check frame welding conditions. | Other | CARBON PASTE LIFTING CRANE | |
| 11674 | 17 Nov 2021 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 1 LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. | Other | TAPPING SEC. CRANE NO. 1 | |
| 11675 | 17 Nov 2021 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 2 LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. | Other | TAPPING SEC. CRANE NO. 2 | |
| 11676 | 17 Nov 2021 | Scheduled Maintenance | TAPPING SECTION E.O.T. CRANE 3 LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. | Other | TAPPING SEC. CRANE NO. 3 | |
| 11677 | 17 Nov 2021 | Scheduled Maintenance | 3RD FLOOR CARBON PASTE LIFTING CRANE LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. | Other | CARBON PASTE LIFTING CRANE | |
| 11678 | 17 Nov 2021 | Scheduled Shutdown | ZESCO POWER SHUTDOWN Electrode 1 pressure ring 2 nos tie rod bolt change with insulation. contact clamp A4, suspension link, fork repaired and change with insulation ALSO FITING ONE PRESSURE BOLT. SEAL BOX ROPE FITTING IS DONE. ITS HYDRAULIC LEKAGE REPAIRE AND ARREST. its A2 clamp hose pipe also changed. ELECTRODE 2 PRESSURE RING 1nos bolt change with insulation. SEAL BOX ROPE FITTING IS DONE. ITS HYDRAULIC LEKAGE REPAIRE AND ARREST. contact clamp B6, suspension link, fork repaired and change with insulation. ALSO SAME CLAMP BRAZING IS DONE. ELECTRODE 3 PRESSURE RING 1nos bolt change with insulation. contact clamp C6, suspension link, fork repaired and change with insulation. welding OF ALL charging chutes are done. all bolts tighting is done. FOR ALL ELECTRODES WE FITTING NEW COOLING BLOWERS. FOR COVERING FURNCE SHEEL TO BASE PLATE WELDING IS DONE. PRESSURE RING AND a2 CLPAM WATER MAINEFOLD SIDE DUMMY THERDS ARE FINISH WE CHANGE IT WITH NEW ONE. | Furnace I | FURNACE 1 | |
| 11679 | 17 Nov 2021 | Scheduled Shutdown | ZESCO POWER SHUTDOWN Electrode 1 contact clamp A4, has leakage from brazing we did brazing now its ok. ELECTRODE 2 contact clamp B5, suspension link, fork repaired and change with insulation. ELECTRODE 3 seal box rope changed now its ok. all bolts tighting is done. FOR COVERING FURNCE SHEEL TO BASE PLATE WELDING IS DONE. its hood pipes are damaged every time so we extend it with MS pipe up to 2nd floor and fitting it there so next time it cant damage. | Furnace II | FURNACE 2 | |
| 11680 | 17 Nov 2021 | Breakdown Maintenance | its gear box motor is burn. we arranging new gear box and motor arrangements for BC 5. we cut its platform. its changing work is done. now its running in good condition. | Furnace I | RMHS BELT CONVEYOR NO.5 | |