| 11651 | 19 Nov 2021 | Scheduled Maintenance | 1. check the water manifold line, T section, and valves.
2. check leakage of hose pipes. | Furnace I | WATER MAINEFOLD | |
| 11652 | 19 Nov 2021 | Scheduled Maintenance | 1. check the water manifold line, T section, and valves.
2. check leakage of hose pipes. | Furnace II | WATER MAINEFOLD | |
| 11653 | 19 Nov 2021 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD. | Furnace I | ELECTRODE 2 | |
| 11654 | 19 Nov 2021 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD. | Furnace I | ELECTRODE 3 | |
| 11655 | 19 Nov 2021 | Scheduled Maintenance | 1. by air pipe clean dust from all cylinders.
2. check leakage of hydraulic oil. if it is then informed to HOD. | Furnace I | ELECTRODE 1 | |
| 11656 | 18 Nov 2021 | Other | POLLTUION TANK FOUNDATION BOLTS FOR BRIDGE FABRICATION WORK IS done. | Other | NEW POLLUTION TANK | |
| 11657 | 18 Nov 2021 | Other | we open some areas roofing sheets at 1st. 2nd and 3rd floor for ventilation. now its closing and fitting work is done. | Other | ROOFING SHEET | |
| 11658 | 18 Nov 2021 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 1
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.
CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.
HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
| Other | CHIPPING YARD CRANE NO. 1 | |
| 11659 | 18 Nov 2021 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 2
LT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.
CT.
1. check coupling, shaft, and pedestal bearing condition and do the greasing.
2. check the gearbox oil level, leakage, and fill if required.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
5. check end traveling gears condition and do the greasing.
HT.
1. check rope drum, hook, rope condition. greasing of rope.
2. check the thruster drum condition and its brake tightness.
3. check all fasteners and mounting bolts.
4. check frame welding conditions.
| Other | CHIPPING YARD CRANE NO. 2 | |
| 11660 | 18 Nov 2021 | Scheduled Maintenance | TELPHER FOR F1
1. checking the bearing, rollers condition, and do lubrication.
2. checking frames welding condition.
3. checking cotter pin and its failure condition.
| Other | TELPHER (FURNACE 1) | |