Maintenance Report
Search Filter:
Showing 11,471-11,480 of 17,159 items.
| # | Date | Type | Details | Furnace | Equipment | Actions |
|---|---|---|---|---|---|---|
| 11471 | 12 Dec 2021 | Breakdown Shutdown | its pump tripped. we starting spare pump number 3 and set amp. after that we found some contact clamps outlet not coming so we switch of furnace and increase pressure. A5 clamp side pulp stuck so we putting air to clear it on that time above transformer side hose pipe also came out. so we fix it. also same time C3 clamp pressure bolt coming out. we fitting it. than c2 clamp has too much water leakage. we cover it. than start furnace. | Furnace II | FURNACE 2 | |
| 11472 | 11 Dec 2021 | Scheduled Maintenance | TILTING HOPPER 1. greasing all bushes. 2.hydraulic pump and motor coupling. 3. checking the hydraulic oil level and if not then fill. 4. check hopper welding sections. CONVEYOR NO 1 1. greasing of bearings. 2. lubrication of rollers and check conditions. 3. check belt status ( if damaged than inform and change) and also check tightness, speed. 4. gearbox oil level check and if not then fill as per requirement. 5. check coupling and key ( if damaged than inform and change) and do the greasing. 6. check the drum condition. 7. check mounting frame welding condition. 8. check rollers condition and if not good then change. CRUSHER 1. check the crusher foundation. 2. check V belts condition. 3. do greasing. 4. check spring rod condition and gap between plates. VIBRATOR 1. check the spring condition. 2. check V belts condition. 3. check vibrations if not good then adjust. 4. check the frame welding condition. ROLLER 1. check roller speed. 2.greasing of bearings. 3.gearbox oil level check and if not then fill as per requirement. 4. check coupling and key ( if damaged than inform and change) and do the greasing. 5. check the drum condition. 6. check the mounting frame welding condition. DISCHARGE CONVEYOR 1. greasing of bearings. 2. lubrication of rollers and check conditions. 3. check belt status ( if damaged than inform and change) and also check tightness, speed. 4. gearbox oil level check and if not then fill as per requirement. 5. check coupling and key ( if damaged than inform and change) and do the greasing. 6. check the drum condition. 7. check mounting frame welding condition. 8. check rollers condition and if not good then change. | Other | WASHING PLANT | |
| 11473 | 11 Dec 2021 | Scheduled Maintenance | WASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. 5. check the high mast lights also. | Other | WASHING PLANT | |
| 11474 | 11 Dec 2021 | Breakdown Maintenance | its bearing is damage. we fitting new one. P209 and P 210. | Furnace I | METAL LIFTING TROLLY | |
| 11475 | 11 Dec 2021 | Other | ITS FABRICATION WORK IS IN PROGRESS. ALL foundation columns are fabricated. tipper foundation is done. today we kept its foundation frame. welding is in progress. 1000 MM conveyor foundation is done. its frame also kept on top. crusher foundation work is in progress. log washer foundation and its fitting also done. discharge conveyor fitting is done. dust conveyor fitting is done. tomorrow we fitting conveyor belt ON BOTH SMALL CONVEYORS. big crusher foundation work is in progress. | Other | NEW WASHING PLANT | |
| 11476 | 10 Dec 2021 | Scheduled Maintenance | F1- ELECTRODE BLOWER 1 SEAL COOLING BLOWER 1, 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. | Furnace I | ELECTRODE 1 | |
| 11477 | 10 Dec 2021 | Scheduled Maintenance | F1- ELECTRODE BLOWER 2 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. | Furnace I | ELECTRODE 2 | |
| 11478 | 10 Dec 2021 | Scheduled Maintenance | F1- ELECTRODE BLOWER 3 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. | Furnace I | ELECTRODE 3 | |
| 11479 | 10 Dec 2021 | Scheduled Maintenance | FURNACE 1 1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check solenoid valves. | Furnace I | HYDRAULIC POWER PACK NO. 1 | |
| 11480 | 10 Dec 2021 | Scheduled Maintenance | FURNACE 1 1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check solenoid valves. | Furnace I | HYDRAULIC POWER PACK NO. 2 | |