| 10931 | 19 Feb 2022 | Breakdown Maintenance | its BC 5 belt counter weight drum welding broken. that's why belt going one side. we check gear box also not moving than found that no gear box oil inside. we open and make it free. now its ok. | Other | RMHS BELT CONVEYOR NO.5 | |
| 10932 | 19 Feb 2022 | Breakdown Maintenance | its BC 5 belt counter weight drum welding broken. that's why belt going one side. we check gear box also not moving than found that no gear box oil inside. we open and make it free. now its ok. | Other | RMHS BELT CONVEYOR NO.5 | |
| 10933 | 19 Feb 2022 | Breakdown Maintenance | its gear box is not moving. we change it and replace it with spare one. now its ok. | Other | RMHS BELT CONVEYOR NO.5 | |
| 10934 | 18 Feb 2022 | Scheduled Maintenance | F1- ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace I | ELECTRODE 1 | |
| 10935 | 18 Feb 2022 | Scheduled Maintenance | F1- ELECTRODE BLOWER 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace I | ELECTRODE 2 | |
| 10936 | 18 Feb 2022 | Scheduled Maintenance | F1- ELECTRODE BLOWER 3
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace I | ELECTRODE 3 | |
| 10937 | 18 Feb 2022 | Scheduled Maintenance | FURNACE 1
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
| Furnace I | HYDRAULIC POWER PACK NO. 1 | |
| 10938 | 18 Feb 2022 | Scheduled Maintenance | FURNACE 1
1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check solenoid valves.
| Furnace I | HYDRAULIC POWER PACK NO. 2 | |
| 10939 | 18 Feb 2022 | Scheduled Maintenance | ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace II | ELECTRODE 1 | |
| 10940 | 18 Feb 2022 | Scheduled Maintenance | ELECTRODE BLOWER 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower. | Furnace II | ELECTRODE 2 | |