Maintenance Report

Search Filter:

Showing 10,911-10,920 of 17,159 items.

#DateTypeDetailsFurnaceEquipmentActions
1091123 Feb 2022Scheduled MaintenanceTAPPING SECTION E.O.T. CRANE 2

LT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

CT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

HT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
OtherTAPPING SEC. CRANE NO. 2
1091223 Feb 2022Scheduled MaintenanceTAPPING SECTION E.O.T. CRANE 3

LT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

CT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

HT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
OtherTAPPING SEC. CRANE NO. 3
1091323 Feb 2022Scheduled Maintenance3RD FLOOR CARBON PASTE LIFTING CRANE

LT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

CT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

HT.
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
OtherCARBON PASTE LIFTING CRANE
1091423 Feb 2022Breakdown Maintenanceits motor is burn. we fix new motor. now its ok.Other RMHS BELT CONVEYOR NO.6
1091523 Feb 2022Breakdown Maintenanceits pump nrv valve is leakage. we fix it now its ok.OtherCOOLING TOWER
1091622 Feb 2022Other1200 mm dia pipe line fabrication work is in progress for f1 pollution. its flange fabrication work is done. we also keep BOTH container at required place. both id fan are connected and tested. duct pipe line connected to chimney.
water pump line connection is done and tested.
container strainers also fitted and tested.
outlet water pipe line work is complete.
pollution can start
OtherPOLLUTION FUME SYSTEM
1091722 Feb 2022Scheduled MaintenanceWATER CIRCULATION PUMP 1,2,3,
FURNACE 1
GRANULATION PUMP 1,2
SUBMERSIBLE PUMP 1,2,
POLLUTION WATER PUMP NO 1

FURNACE 2
GRANULATION PUMP 1,2,
POLLUTION WATER PUMP NO 1,
OFFICE SUBMERSIBLE PUMP 1,
WASHING PLANT SUBMERSIBLE PUMP 1

1. check the pump condition and check discharge.
2. check coupling condition, alignment, and do greasing.
3. check pipelines and valve's condition.
4. check cooling towers nozzles condition.
OtherPUMP
1091822 Feb 2022Scheduled MaintenanceF1- GRANULATION MOTOR 1,2 WATER CIRCULATION PUMP MOTOR 1,2,3, SUBMERSIBLE PUMP MOTOR 1,2, POLLUTION WATER PUMP MOTOR
NO 1

F2- GRANULATION MOTOR 1,2, POLLUTION WATER PUMP MOTOR NO 1, OFFICE SUBMERSIBLE PUMP MOTOR 1,
WASHING PLANT SUBMERSIBLE PUMP MOTOR1

1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. water circulation pump motor greasing.
OtherPUMP
1091922 Feb 2022Otherprotection shield fabrication and insulation drilling work is done.Furnace IIFURNACE 2
1092021 Feb 2022Scheduled MaintenanceALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.

OtherRMHS CONVEYOR