| 10861 | 28 Feb 2022 | Breakdown Shutdown | its hydraulic slipping cylinder at electrode 3 is leakage from top part. we tight top bolts. now its ok. | Furnace I | ELECTRODE 3 | |
| 10862 | 28 Feb 2022 | Breakdown Shutdown | electrode 1 sparking and 2nd floor pressure ring pipe with copper pipe is touching. we cut one hose pipe piece and separate it. after that clamp A2,2,4,5,6, sparking and water leakage. we put pulp to stop it. now its ok. | Furnace I | ELECTRODE 1 | |
| 10863 | 27 Feb 2022 | Breakdown Shutdown | its hood is leakage. we weld it now its ok. | Furnace II | HOOD SECTION | |
| 10864 | 27 Feb 2022 | Breakdown Shutdown | its hood side again leakage start. we weld it now it ok. | Furnace II | HOOD SECTION | |
| 10865 | 26 Feb 2022 | Scheduled Maintenance | TILTING HOPPER
1. greasing all bushes.
2.hydraulic pump and motor coupling.
3. checking the hydraulic oil level and if not then fill.
4. check hopper welding sections.
CONVEYOR NO 1
1. greasing of bearings.
2. lubrication of rollers and check conditions.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.
4. gearbox oil level check and if not then fill as per requirement.
5. check coupling and key ( if damaged than inform and change) and do the greasing.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change.
CRUSHER
1. check the crusher foundation.
2. check V belts condition.
3. do greasing.
4. check spring rod condition and gap between plates.
VIBRATOR
1. check the spring condition.
2. check V belts condition.
3. check vibrations if not good then adjust.
4. check the frame welding condition.
ROLLER
1. check roller speed.
2.greasing of bearings.
3.gearbox oil level check and if not then fill as per requirement.
4. check coupling and key ( if damaged than inform and change) and do the greasing.
5. check the drum condition.
6. check the mounting frame welding condition.
DISCHARGE CONVEYOR
1. greasing of bearings.
2. lubrication of rollers and check conditions.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.
4. gearbox oil level check and if not then fill as per requirement.
5. check coupling and key ( if damaged than inform and change) and do the greasing.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change. | Other | WASHING PLANT | |
| 10866 | 26 Feb 2022 | Scheduled Maintenance | WASHING PLANT TILTING HOPPER, CONVEYOR NO 1, CRUSHER, VIBRATOR, ROLLER, DISCHARGE CONVEYOR , WATER PUMP
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
5. check the high mast lights also. | Other | WASHING PLANT | |
| 10867 | 25 Feb 2022 | Breakdown Maintenance | its fixed jaw plate is fully damaged. its repairing work is in done. we fitted it. now its ok. | Other | CRUSHER ( WASHING PLANT) | |
| 10868 | 25 Feb 2022 | Scheduled Maintenance | F1- ELECTRODE BLOWER 1
SEAL COOLING BLOWER 1,
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace I | ELECTRODE 1 | |
| 10869 | 25 Feb 2022 | Scheduled Maintenance | F1- ELECTRODE BLOWER 2
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace I | ELECTRODE 2 | |
| 10870 | 25 Feb 2022 | Scheduled Maintenance | F1- ELECTRODE BLOWER 3
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
| Furnace I | ELECTRODE 3 | |