| 10851 | 01 Mar 2022 | Scheduled Maintenance | WATER CIRCULATION PUMP 1,2,3,
FURNACE 1
GRANULATION PUMP 1,2
SUBMERSIBLE PUMP 1,2,
POLLUTION WATER PUMP NO 1
FURNACE 2
GRANULATION PUMP 1,2,
POLLUTION WATER PUMP NO 1,
OFFICE SUBMERSIBLE PUMP 1,
WASHING PLANT SUBMERSIBLE PUMP 1
1. check the pump condition and check discharge.
2. check coupling condition, alignment, and do greasing.
3. check pipelines and valve's condition.
4. check cooling towers nozzles condition.
| Other | PUMP | |
| 10852 | 01 Mar 2022 | Scheduled Maintenance | F1- GRANULATION MOTOR 1,2 WATER CIRCULATION PUMP MOTOR 1,2,3, SUBMERSIBLE PUMP MOTOR 1,2, POLLUTION WATER PUMP MOTOR
NO 1
F2- GRANULATION MOTOR 1,2, POLLUTION WATER PUMP MOTOR NO 1, OFFICE SUBMERSIBLE PUMP MOTOR 1,
WASHING PLANT SUBMERSIBLE PUMP MOTOR1
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. water circulation pump motor greasing.
| Other | PUMP | |
| 10853 | 01 Mar 2022 | Breakdown Shutdown | it hood section leakage from electrode 3 side due to protection shield is coming out and touch it. we open seal box and use chain block to lift it. now its ok | Furnace II | HOOD SECTION | |
| 10854 | 01 Mar 2022 | Breakdown Maintenance | its id fan Plummer block foundation bolts are open due to heavy vibration. we put new bolts and tight it. now its ok. | Other | POLLUTION 1, ID FAN NO. 1 | |
| 10855 | 01 Mar 2022 | Breakdown Maintenance | ITS ALL CRUBEERS ARE COMING OUT DUE TO BROKEN WELDING. WE FIT IT AND WELD IT. NOW ITS OK. | Other | PELLET PLANT | |
| 10856 | 01 Mar 2022 | Breakdown Maintenance | ITS ADJUSTMENT BOLTS ARE DMAGED. WE CHANGE IT . NOW ITS OK. | Other | cock crusher | |
| 10857 | 28 Feb 2022 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform.
2. check panel board, clean, & tight all loose parts.
3. all parts clean by hand blower.
4. check limit switches and its condition. ensure that all limit switches and wires working properly.
| Other | RMHS CONVEYOR | |
| 10858 | 28 Feb 2022 | Scheduled Maintenance | ALL VIBRATORS
check Vibro feeders coil connection, its condition and ensure its working properly with adjusting its vibrations. | Other | RMHS VIBRO FEEDER | |
| 10859 | 28 Feb 2022 | Scheduled Maintenance | ALL CONVEYORS
BC 1, BC 2, BC 3, BC 4, BC 5, BC 6, BC 7
1. greasing of bearings.
2. lubrication of rollers and check conditions.
3. check belt status ( if damaged than inform and change) and also check tightness, speed.
4. gearbox oil level check and if not then fill as per requirement.
5. check coupling and key ( if damaged than inform and change) and do the greasing.
6. check the drum condition.
7. check mounting frame welding condition.
8. check rollers condition and if not good then change.
| Other | RMHS CONVEYOR | |
| 10860 | 28 Feb 2022 | Breakdown Shutdown | its electrode electrode 3 all hydraulic hose pipe burns due to eruption. we change it and fitting new one. now its ok. | Furnace II | HOOD SECTION | |