| 1 | 28 May 2026 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 1 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. 2. check the gearbox oil level, leakage, and fill if required. 3. check all fasteners and mounting bolts. 4. check frame welding conditions. 5. check end traveling gears condition and do the greasing. CT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. 2. check the gearbox oil level, leakage, and fill if required. 3. check all fasteners and mounting bolts. 4. check frame welding conditions. 5. check end traveling gears condition and do the greasing. HT. 1. check rope drum, hook, rope condition. greasing of rope. 2. check the thruster drum condition and its brake tightness. 3. check all fasteners and mounting bolts. 4. check frame welding conditions. | Other | CHIPPING YARD CRANE NO. 1 | |
| 2 | 28 May 2026 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 2 LT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. 2. check the gearbox oil level, leakage, and fill if required. 3. check all fasteners and mounting bolts. 4. check frame welding conditions. 5. check end traveling gears condition and do the greasing. CT. 1. check coupling, shaft, and pedestal bearing condition and do the greasing. 2. check the gearbox oil level, leakage, and fill if required. 3. check all fasteners and mounting bolts. 4. check frame welding conditions. 5. check end traveling gears condition and do the greasing. HT. 1. check rope drum, hook, rope condition. greasing of rope. 2. check the thruster drum condition and its brake tightness. 3. check all fasteners and mounting bolts. 4. check frame welding conditions. | Other | CHIPPING YARD CRANE NO. 2 | |
| 3 | 28 May 2026 | Scheduled Maintenance | TELPHER FOR F1 1. checking the bearing, rollers condition, and do lubrication. 2. checking frames welding condition. 3. checking cotter pin and its failure condition. | Other | TELPHER (FURNACE 1) | |
| 4 | 28 May 2026 | Scheduled Maintenance | TELPHER FOR F2 1. checking the bearing, rollers condition and do lubrication. 2. checking frames welding condition. 3. checking cotter pin and its failure condition. | Other | TELPHER ( FURNACE 2) | |
| 5 | 28 May 2026 | Scheduled Maintenance | POLLUTION ID FANS (Furnace 1) 1. open cover and clean dust. 2. check the balancing of impeller and vibration isolation. 3. check v belts condition and inform if its on critical stage. 4. check foundation bolts and nuts of Plummer blocks. 5. greasing the Plummer blocks. 6. check the duct condition and remove dust from the duct. 7. check stack condition and check its temperature. | Other | POLLUTION 1 | |
| 6 | 28 May 2026 | Scheduled Maintenance | POLLUTION ID FANS FOR (Furnace 2) 1. open cover and clean dust. 2. check the balancing of impeller and vibration isolation. 3. check v belts condition and inform if its on critical stage. 4. check foundation bolts and nuts of Plummer blocks. 5. greasing the Plummer blocks. 6. check the duct condition and remove dust from the duct. 7. check stack condition and check its temperature. | Other | POLLUTION 2 | |
| 7 | 28 May 2026 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 1 LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. | Other | CHIPPING YARD CRANE NO. 1 | |
| 8 | 28 May 2026 | Scheduled Maintenance | CHIPPING YARD E.O.T. CRANE 2 LT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. CT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. HT. 1. check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. 4. check limit switches and its condition. ensure that all limit switches and wires working properly. | Other | CHIPPING YARD CRANE NO. 2 | |
| 9 | 28 May 2026 | Scheduled Maintenance | TELPHER FOR F1 1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. | Other | TELPHER (FURNACE 1) | |
| 10 | 28 May 2026 | Scheduled Maintenance | TELPHER FOR F2 1.check motor condition ( amp, volt, and connectivity) if the noise coming than inform. 2. check panel board, clean, & tight all loose parts. 3. all parts clean by hand blower. | Other | TELPHER ( FURNACE 2) | |